P400 Installation
Table Of Contents
- SolarEdge Installation Guide - North America Version 4.0
- Disclaimers
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Technical Specifications
- Appendix C: Mechanical Specifications
- Appendix D: External Fan Maintenance and Replacement
- Appendix E: Replacing and Adding System Components
- Appendix F: Inverter Arc Detection and Interruption
Figure 4: Power optimizer installation and grounding using a star washer
l For mounting on rails with sliding nut fasteners:UsetheSolarEdgegroundingplate
(purchasedseparately)betweentherailingandtheflatsideofthemountingbracket.
Applytorqueof9.5N*m/7lb*ft.
Figure 5: Power optimizer installation and grounding using a grounding plate
l For mounting on rails with sliding nut fasteners, or an un-grounded structure(suchasa
woodenstructure):Connectanequipment-groundingconductortothegrounding
terminalaccordingtothesuppliedinstructions(theterminalshouldbepurchased
separately).Thegroundingterminalacceptsawiresizeof6-14AWG,andmustbe
sizedforequipmentgroundingperNEC250.122requirements.Tightenthescrews
connectingthepoweroptimizertotheframeandthegroundingterminalscrew.Apply
torqueof9.5N*m/7lb*ft.
Chapter 2: Installing the Power Optimizers
SolarEdge-Installation Guide MAN-01-00002-4.0
19