P400 Installation
Table Of Contents
- SolarEdge Installation Guide - North America Version 4.0
- Disclaimers
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Technical Specifications
- Appendix C: Mechanical Specifications
- Appendix D: External Fan Maintenance and Replacement
- Appendix E: Replacing and Adding System Components
- Appendix F: Inverter Arc Detection and Interruption
Ifthismessageisdisplayed:
1. TurntheinverterON/OFFswitchtoOFF.
2. CheckallPVstringsforthecorrectopen-circuitvoltage:
l Inspectallconnectionsandcablesbetweenthepoweroptimizersinthestrings:
Verifytheyareconnectedproperlybyfirmlypushingtheplugsandverifyingthe
connectorsarelocked.
l InspectallconnectionsandcablesbetweenthePVmodulesandthepower
optimizers:Verifytheyareconnectedproperlybyfirmlypushingtheplugsand
verifyingtheconnectorsarelocked.
l VerifythatthestringsarefirmlyattachedtotheSafetySwitchterminalblocks.
3. Performmanualrestarttoresumesystemoperation:TurntheinverterON/OFFswitchto
OFFandthenON.Theinverterperformsanarcdetectionself-testandstartsnormal
operation.
To troubleshoot self-test failures:
Iftheself-testfails,theinverterdisplaysanerrormessageindicatingthatthearcdetector
hardwarefailedduringwake-uptests:
E r r o r 1 5 2
A F C I
s e l f - t e s t f a i l e d
Theinvertertransmitsanerrormessagetothemonitoringportal,andcontinuouslyrepeats
thearcdetectionself-testuntilitissuccessful.
Iftheproblempersists,contactSolarEdgesupport.
SolarEdge-Installation Guide MAN-01-00002-4.0
124
Appendix F: Inverter Arc Detection and Interruption