Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing and Connecting the Backup Interface
- Chapter 3: System Configuration
- Troubleshooting
- Appendix A: Manually Switching the System to the Grid-connected Mode
- Appendix B: Connecting External CTs
- Appendix C: System Performance LED Indication
- Appendix D: StorEdge Backup Interface Technical Specifications
- Support Contact Information
5.
Drill two holes where marked.
Figure 5: Drilling holes
6. Install the conduit holder.
7.
Tighten the conduit holder to the mounting surface with two screws.
Figure 6: Securing the conduit holder with screws
8. Tighten the conduit holder to the outer left fin with the supplied screw. Tighten the
screw with a torque of 41 lb*in / 4.7 N*m.
Backup Interface Installation Guide MAN-01-00728-1.0
12 Installing the Conduit Holder