Install Manual

9.
Connect Line 1 and Line 2 wires from the ACloads panel to the loads line terminal.
Tighten the terminal screws with a torque of 200 lb*in / 22.5 N*.
Figure 8: Connection to the ACLoads Panel
10.
Connect the Line 1 and Line 2 wires to the grid's line terminal. Tighten the terminal
screws with a torque of 200 lb*in / 22.5 N*.
Figure 9: Connection to the Grid
11. Reinstall the plastic covers onto the loads terminals.
Chapter 2: Installing and Connecting the Backup Interface 15
Backup Interface Installation Guide MAN-01-00729-1.0