Install Manual

Connecting the Backup Interface to the Grid and AC
Loads Panel
For connecting the Backup Interface to the grid and loads panel, use the following
cable types:
For the grid - 4-4/0 AWG
For the loads panel - 4-4/0 AWG
To connect to the Grid and Loads panels
1.
Release the six Allen screws of the Backup Interface cover and remove the cover.
NOTE
Do not remove the internal plastic cover (dead front).
2. Install a conduit of the required diameter into the Loads conduit entry. Use the
conduit holder to support the conduit.
3. Install a conduit of the required diameter into the Grid conduit entry. Use the
conduit holder to support the conduit.
4.
Remove the plastic covers from Loads terminals.
5. If required, connect the grounding and neutral bars with the bonding, supplied with
the Backup Interface. Tighten the bonding screws with a torque of 41 lb*in / 4.7
N*m.
6. Pass the cable from the AC Loads panel through the Loads conduit.
7.
Pass the cable from the grid through the Grid conduit.
8. Connect the neutral and grounding wires to the neutral and grounding terminals.
Tighten the terminal screws with a torque of 200 lb*in / 22.5 N*m.
Backup Interface Installation Guide MAN-01-00729-1.0
14 Connecting the Backup Interface to the Grid and AC Loads Panel