User Manual

Table Of Contents
9
information could be seeing in mobile phone and computer.
Easy firmware update: The BMS firmware can be updated to the latest version.
See
Chapter 9 Firmware Update.
Expandability: The battery capacity can be increased by adding another battery.
See part 5.4 cable connections.
3 Guidance for disconnection of batteries during shipment
1) Cartons that have been crushed, punctured, or torn in such a way that contents
are revealed shall be set aside in an isolated area and inspected by a skilled
person. If the package is deemed to be not shippable, the contents shall be
promptly collected, segregated, and either the consignor or consignee
contacted.
2) The DC circuit of CFE Residential ESS has been disconnected before outgoing.
3) A precautionary label had been affixed to the shipping carton to alert
individuals as to the battery within the package have been disconnected;
otherwise, the battery should not be transported.
4) We have conducted comprehensive tests to ensure the equipment they
distribute around the world is safe for shipping transport. These products shal
be handled with care and immediately inspected if visibly damaged. lf the
cartoon visibly damaged,please contract with CFE customer careline to confirm
whether the battery could be used safely or not.
4 Installation Prerequisites
4.1 Installation location
Make sure that the installation location meets the following conditions:
The building is designed to withstand earthquakes.
Far away from the sea to avoid salt water and humidity.
The floor is flat and level.
No flammable or explosive materials nearby.
Optimal ambient temperature is between 15℃ and 30°C.