Instructions
Construction of the gear assembly set:
Push in the worm all the way in: Use superglue sparingly (leave the glue to set
per glue instructions):
Solder on the cog in the middle or cement in
place with good metal adhesive (leave the glue
to set per glue instructions):
Remove excess tin / glue:
Mount the gearbox, slide the motor in all the way: Use superglue sparingly (leave the glue to set
per glue instructions):
Slide on the copper bushings (must turn easily
on the axle) then insert axle:
The axle should have minimum play (horizontal)
in the uptake and not jam:
Screw on the gear cover loosely then tighten
crosswise after running in:
M1 thread for mounting in the chassis
Subject to changes and errors / Status January 2017 / Christian Repky ©
SOL-EXPERT group
Dept. 1zu87modellbau.de
Managing Director: Christian Repky
Mehlisstrasse 19
88255 Baindt
Tel.: 07502 - 941150
Fax: 07502 - 94115-99
www.sol-expert-group.de
info@sol-expert-group.de
CONSTRUCTION MANUAL
Motor for micro-models, enclosed. Brass with steel axle, developed specifically for 1:87 lorries.
Gear Assembly Set G494B, 1:494 Item no. 96751
www.1zu87modellbau.de
SOL-EXPERT
group
group


