SA-12K Install Guide and Owner Manual

Table Of Contents
June 30
th
, 2022 47
Stacking Sol-Ark 12K @ 120V/240V Outputs
Parallel 12Ks
Continuous On &
Off Grid (kW)
Pass Through (kW)
Peak 10sec (VA)
1
9
15
16
2
18
30
32
3
27
45
48
4
36
60
64
5
45
76
80
6
54
91
96
7
63
106
112
8
72
121
128
Stacking Sol-Ark 12K @ 120V/208V Outputs (3-phase)
Parallel 12Ks
Continuous On &
Off Grid (kW)
Pass Through (kW)
Peak 10sec (VA)
1*
9
15
16
2**
18
30
32
3
27
45
48
4
NA
NA
NA
5
NA
NA
NA
6
54
91
84
7
NA
NA
NA
8
NA
NA
NA
9
81
136
144
*Two phases only **Three phases but unbalanced (4.8kW, 6.2kW, 4.8kW)
MUST wire load outputs in parallel for systems to work correctly!
E. Communication lines must be connected between parallel units, as shown in the wire diagrams section
a. Preferred shielded CAT 6 cable for this purpose
F. Program all units to "Parallel" in the "Basic Setup" screen under the "Parallel" tab
b. Set one system to "Master" | Modbus SN: 1
c. Set all others to "Slave" | Modbus SN: 2,3,4…
d. Phases B/C for 120V/208V installations only
e. Power up slaves first, then Master
i. You will get an F29 or F41 error until both slaves and Master are on
Note: You must always fully power cycle all inverters after enabling or disabling parallel settings.
Check Pg. 24 for more info on Power cycling
G. Ensure the Generator is connected to all systems in parallel (if applicable).
Note: The values shown on the home screen of each system represent each system's contribution, not the
total of the array.