User's Manual

Page: 35
Soapy Care Ltd.
Appendix A
Download the template from here:
www.soapy.care/posters and print this template as is on the A4 paper with
no shoulders and follow the instructions to prepare 4 holes for the plugs.
Appendix B
The needed tools and equipment for the successful installation of ECO-02.
1. Leveler
2. Open key (Water, screws)
3. Screwdriver, 25 cm length (Head)
4. Hammer, 400 gr
5. Teflon tape
6. Drill machine
7. Scissors/knife for the package opening