User guide

Operation From Ground Control Box
1.
Set the Battery switch (1) to ON.
2.
Set the Master Key Switch (2) to ON.
3.
Pull the Emergency Stop switch (3) out (on).
4.
Set the Platform/Ground Selector switch
(4) to GROUND (down).
5. Hold appropriate platform-moving switch (6)
the direction you want the platform to move.
6.
Hold the Ground Operation switch (7) up.
7.
Hold the Emergency Power switch (8) down
and the platform will move.
Boom movements will be slow and have long lag
times under Emergency Power.
page 9 - 2 AB46J 0163187
9. Emergency Operation