Users Manual
- 2 -
STEP 5: If clear, place the
ConnectLight over the outlet
and secure with screw(s). Be
sure that the prongs slide
ins ide the electrical box.
STEP 3: Remove existing
coverplate from the outlet.
These areas must be clear
STEP 4: Look into the box to
determine if the areas around the
screw terminals are clear so that
the prongs can pass into the box
and around the outlet. If the area
is not clear, see the “Obstructions”
section of this manual.
STEP 1: Select an outlet for the
ConnectLight to be installed over.
This ConnectLight is only
compatible with standard duplex or
décor outlets with side screw
terminals.
STEP 2: TURN OFF POWER
at the circuit breaker and TEST
that the power is off at the
outlet before removing the
existing coverplate or
proceeding with the installation.
Installation Instructions
STEP 6: Turn ON electrical
power to the outlet. Darken the
room and move in front of the
ConnectLight to test for
functionality.
OFF
O
F
F
OFF
OFF
O
F
F
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Duplex DecorDuplex Decor
GFCI
Test and
Reset
Buttons