® Setup GrassCollectionSystems IMPORTANT NOTE: These FAST-Vac Systems fit 2005 and newer Model Year product equipped with the rubber discharge chute.
Thank you for purchasing this quality-built Ferris product. you've placed your confidence in the Ferds brand. maintained according to the instructions in this manual, provide many years of dependable service. This hazards manual contains and risks associated We're pleased that When operated and your Ferds product will safety information to make you aware of the with this machine and how to avoid them.
TableofContents SAFETY RULES & iNFORMATION ..................... Safety Decals .......................................................... 2 3 GENERAL OPERATING iNSTRUCTiONS ........... Before Operation ..................................................... Mowing with the Double / Triple Catcher ................ After Operation ........................................................ Storing the Grass Catcher ...................................... Mowing Without the Blower .................................
SafetyRules& Informtm Read these safety rules and follow them closely. Failure to obey these rules could result in loss of control of unit, severe personal injury or death to you, or bystanders, or damage to property or equipment. This mowing deck is capable of amputating hands and feet and throwing objects. The triangle ,_ in text signifies important cautions or warnings which must be followed.
SafetyDecals SAFETY DECALS This unit has been designed and manufactured to provide you with the safety and reliability you would expect from an industry leader in outdoor power equipment manufacturing. Although reading this manual and the safety instructions it contains will provide you with the necessary basic knowledge to operate this equipment safely and effectively, we have placed several safety labels on the unit to remind you of this important information while you are operating your unit.
GefleraJ (JperatJflg Jflstructms BEFORE OPERATION Clear the lawn of all sticks, stones, wire and other debris which may be caught or thrown by the mower blades. Check grass condition. If wet, wait until later in the day. if grass is wet, the grass catcher is likely to become plugged. For efficient bagging, air circulation under the mower deck, through the chute and into the bag is very important.
Gefleral(Jperatiflg Iflstructms AFTER OPERATION Remove any debris from the the screen on the underside of the lid. Note: The lid screen can be partially removed for easier cleaning and should be cleaned regularly. The blower housing and tube should be removed for cleaning. Inspect the grass bags for wear or damage. Make sure that there is a snug fit between mower deck, blower housing, tubes, and grass catcher cover.
suspeflsmAdjustmflt REAR SUSPENSION For IS1500Z & IS2000Z ADJUSTMENT Models: POSITION #1 \ (FACTORY POSITION #2 (GRASS BAGGER) / / / .......... The upper mounting position #2 (See Figure 1) should be used when a rear-mount grass bagger system is installed. To adjust the upper mounting position: 1. Park machine on a flat, level surface. Disengage the PTO, stop the engine and engage the parking brake. 2. Raise the rear of the machine and secure with jackstands.
BallJoJfltReplacement BALL JOINT REPLACEMENT For IS2000Z Models with 52" Mower Deck: The existing ball joint (A, Figure 2) on the right-hand front suspension arm has to be replaced with the ball joint provided in the kit. This change is necessary to provide clearance for the blower unit and must be completed before blower unit installation. MEASUREHERE To replace the ball joint: 1. Lower the front of the mower deck down on to wooden blocks to relieve the tension on the front deck hanger chains.
BlowerAssembly BLOWER ASSEMBLY Preparing the Mower Deck (IS4500Z Models Only) 1. Loosen the 3/8-24 hex nut (A, Figure 5) that secures the idler arm (C) to the blower assembly. Remove the idler arm assembly from the blower assembly. 2. Loosen the 1/2" hardware that secures the idler pulley (G) to the idler arm assembly. Remove the idler pulley from the idler arm assembly. Discard the bolt that secured the idler pulley to the idler arm assembly. 3. Refer to figure 6.
BlowerAssembly 8. Loosen the 3/8-16 hex serrated flange nut (A, Figure 7) that secures the adjustable idler pulley (D) to the blower assembly. Remove the 3/8-16 hex serrated flange nut (A), and all the components the nut secured. Discard the 3/8-16 X 2" bolt. 9. Place the support plate (B) on the blower assembly. Line up the two rows of holes in the support plate with the two rows of holes on the blower assembly. 10. Refer to figure 7.
BlowerAssembly Blower Assembly 1. Remove the existing 5/16-18 x 5/8" flange head bolts (B, Figure 9) from the blower housing (A). 2. Install the blower mount plate (C) onto the blower housing and reinstall the 5/16-18 x 5/8" flange head bolts. Tighten securely. 3. Install three (3) 3/8-16 x 1" bolts and nylon lock nuts (D) through the blower mount plate and blower. The bolt heads must be installed on the inside of the blower housing. © Figure 9. Install Blower Mount Plate A. Blower Housing B.
BlowerAssembly 5. Remove the blower belt guard and set aside. IS5OOZ, IO00Z, ISlOOOZ, IS1500Z, IS2OOOZ, IS3OOOZ, IS3100Z, S150X, S2OOX Series Models: 6. install the impeller drive pulley (A, Figure 11) onto the impeller shaft (B) as described in Figure 11. install the 1/4" x 1-1/2" long key (not shown) in the pulley. 7. Align the pulley groove with the appropriate slot as described in Figure 11. Tighten the set screws in the pulley. 8.
Mower DeckPreparation Remove the Discharge Chute 1. Remove the discharge chute (A, Figure 14), chute mount rod (B) and mounting hardware. 2. Remove the chute lock bolt (C) and nut. 3. Remove the deck guard (D). Save the bolts and washers, as they will be required in a later step. Figure 14. Remove Chute & Guard A. Discharge Chute B. Chute Mount Rod C. Chute Lock Bolt D. Guard , Examine the discharge chute mount bracket on the mower deck (see Figure 15).
Mower DeckPreparation ISlOOOZ Series (52" Model): 1. Loosen the spring compression nut (B, Figure 17) to release the belt tension. 2. Slide the drive belt over the edge of the idler pulley and then remove the belt from the righthand (discharge side) spindle pulley. Figure 17. Mower PTO Belt A. Belt Tension Spring B. Spring Compression Nut IS2000Z Series (52" Model): 1. Using a 1/2" breaker bar, place the square end in the square hole located in the end of the idler arm (A, Figures 18).
Mower DeckPreparaUon S200X Series: 1. Using a 1/2" breaker bar, place the square end in the square hole located in the end of the idler arm (A, Figures 20). Carefully rotate the breaker bar counter-clockwise, which will relieve the tension on the belt exerted from the idler arm. 2. Slide the drive belt over the edge of the stationary idler pulley (B). Carefully release the tension on the breaker bar. Remove the belt from the righthand (discharge side) spindle pulley. Figure 20. Mower PTO Belt A.
Mower DeckPreparation Remove the Spindle Pulley i IS500Z Series, 1000Z Series, ISl000Z Series, IS1500Z, IS2000Z, IS3000ZF & ZX Series, S150X & S200X Series: , Remove the 3/4-16 hex nut & 3/4" spring washer (A & B, Figure 22) securing the spindle pulley (C) to the spindle shaft. Use a 1" wrench on the flats of the blade end of the spindle shaft to prevent the shaft from spinning. Save the 1/4" key (D). IS3000ZL Series, IS3100Z Series, & IS4500Z Series: 1.
Mower DeckPreparation Reinstall the Spindle Belt Refer to the belt removal instructions on Page 10, 11, & 12 and reverse the order for reinstalling the belt. Install the Deck Guard 1. Install the new deck guard onto the mower deck and secure with the hardware previously removed (see Figure 24). NOTE: The IS2000Z with 52" deck has a 2-piece deck guard, Install as shown in Figure 25, NOTE: The IS4500Z Series has a 3-piece deck guard. Install as shown in Figure 26, Figure 24. Install Guard Figure 25.
BlowerJflstaflatm , Install the blower onto the mower deck. Refer to 0 Figure 27 for the position of the quick pins in relationship to the chute mount bracket on the mower deck. The quick pins fit into the same holes that the chute mount rod was installed. 0/ 44"& 48" Decks 52" & 61" Decks Figure 27. Install Blower On Deck (Notice Pin Orientation) 2. Install the blower drive belt. Refer to Figure 28 for the proper belt routing.
BlowerJflstaflatm 3. Check the belt tension by measuring the distance from the center of the v-idler pulley (A, Figure 29) mounting bolt and the blower housing. This should measure between 3 - 3-3/8" (7,6 - 8,6 cm). 4. If measurement falls outside of this range, you must move the idler pulley (B) either forward or back to achieve the proper belt tension.
Coflector JnstaflatJon InstalJ ColJector Mount PJate (lO00Z & ISlOOOZ Series) 1. Remove the hardware securing the rear bumper screen (A, Figure 31) to the top and bottom bumpers (A, B). Save the 3/8" bolts and washers from the lower bumper. Figure 31. Remove Bumper A. Screen B. Top Bumper C. Lower Bumper 2 .Install the collector mount plate (A, Figure 32) on to the lower bumper and secure with the previously removed 3/8" bolts, 3/8" washers (B) and new 3/8-16 nylock flange nuts (E). 3.
Collector IflstalJatiofl InstalJ ColJector Mount PJate (iS5OOZ Series, iS1500Z Series, IS2OOOZSeries, & IS4500Z Series) IMPORTANT NOTE: If the collector system is being installed on an IS4500Z Series model the Extreme Duty Rear Bumper Kit (5600019) must be installed first. 1. Install the collector mount plate (A, Figure 33) and mount tabs (B) on to the bumper.
Collector Jflstallatm Remove the Rear Engine Shield (JS3100Z with 4-Tube Rear Bumper) 1. If the engine is hot, allow sufficient time for the muffler to cool to prevent a burn injury during installation. 2. Remove the rear engine shield (C, Figure 35) from the top of the rear bumper (D) by removing the 3/8" hardware (A, B, & E) securing the shield to the bumper. Figure 35. Remove the Rear Engine Shield A. 3/8=16X1" Bolts B. 3/8" Washers C. Rear Engine Shield D. Rear Bumper E.
Collector Iflstallatm InstalJ ColJector Mount PJate (JS3000Z Series) 1. Install the collector mount plate (A, Figure 38) and mount tabs (B) on to the bumper. Install the 3/816 x 2-3/4" bolts (C) through the mount tabs and loosely secure with the clamp bars (D) and 3/8-16 nylock flange nuts (F). 2. Install the 3/8-16 x 2-1/2" bolts (E) through the bottom mounting holes and loosely secure with the clamp bars (D) and 3/8-16 nylock flange nuts (E). 3.
Coflector Jflstaflatm InstalJ ColJector Mount PJate (S150X & S2OOX Series) 1. Remove the carb. shield plate from top of the rear bumper. 2. Install the collector mount plate (A, Figure 40) and mount tabs (B) on to the bumper. Install the 3/816 x 1-1/4" bolts (C) and 3/8" SAE washers (F) through the mount tabs and loosely secure with the 3/8-16 nylock flange nuts (E). 3.
Collector IflstaJlatm Assemble Collector Hood 1. Install the inlet tube (B, Figure 42) to the collector back plate (A) and secure with the 5/16-18 x 3/4" bolts (C) and 5/16-18 nylock flange nuts (D). 2. Install the mount posts (E) on the back plate and loosely secure with the 3/8-16 x 1" bolts (F) and 3/8-16 nylock flange nuts (G). NOTE: On the 3-bag collector back plate, instafl the eight (8) suppfied hole plugs in the remaining mounting holes not used. 3.
Coflector JnstaflatJon InstaiJ ColJector Bags 1. Raise the collector hood and slide the collector bags (A, Figure 43) onto the frame rails (B). NOTE: The collector bags are constructed with three mesh panels and one solid paneL Install the bag with the solid panel towards the front of the machine. Figure 43. Install the Collector A. ColJector Bag B. Frame Rails Bags 2. Lower the hood and push the lock pin (B, Figure 44) through the hood lock plate (A). Figure 44. Lock Hood A. Hood Lock Plate B.
Coflector JnstaflatJon Install Hose 1. Lower the mower deck to the lowest cutting position. 2. See Figure 45. Install the hose (A) onto the blower and secure with the removable clamp (with knob) (B). At least two bands must cover the outlet of the blower (C). 3. Cut the hose to fit properly between the blower and collector as shown in Figure 45. At least two bands must cover the inlet of the collector (D). Secure with the stationary clamp (E). \ Figure 45. JnstaJJHose A. Hose B.
WeightMeufltJflstalJatm {| OOOZSepies Install Weight Carrier 1. Remove the hairpin clip and clevis pin and remove the deck lift foot pedal. Lift the floor plate. 2. Install the weight carrier (E, Figure 46), mount plates (B & C) and fasten with the 3/8-16 x 3" bolts (A) and 3/8-16 nylon lock nuts (D). Tighten securely. 3. Install the counter weights (H) in the weight carrier and secure with the retaining pin (F) and hair pin clips (G). 4.
WeightMeufltJflstaflatm (1810007 SepJes) InstalJ Weight Carriers 1. Install the left-hand and right-hand weight carriers (E & H, Figure 47), bar clamps (F) and fasten with the 5/16-18 x 2-1/2" bolts (B) and 5/16-18 nylon lock nuts (G). Make sure carriers are tight against the outside of the suspension arm and do not interfere with the shock/spring assembly. Tighten securely. 2. Install the counter weights (A) in the weight carrier and secure with the clevis pins (D) and hair pin clips (C). \ \\/" \\ /
Install Weight Mount Rack 1. Measure and mark the front main frame tubes to the dimensions shown in Figure 48. 2. Using a 3/8" drill bit, drill one (1) hole in each of the main frame tubes from the outside surface of the tube. Figure 48. Hole Location 3. Slide the weight mount rack into the main frame tubes and align with the holes drilled through the frame (see Figure 49). It may require you drive the arms into the frame tubes using a wooden block and hammer. 4.
WeightMou.t Iflstaflatm {JSSOOZ & iS| 5007 Series) Install Weight Carrier 1. Install the weight carrier (A, Figure 51) onto the front of the unit and secure with the 1/2-20 x 11/4" bolts (B), 1/2" washers (C) and 1/2-20 nylon lock nuts (D). NOTE: Use outer holes in the weight carrier for the /S1500Z Series (shown) and the inner holes for the IS4500Z Series. 2. Install the counter weights (E) in the weight carrier and secure with the retaining pin (F) and hairpin clips (G). ® J Figure 51.
WeightMeufltJflstallatm {Iszeeez series) Install Weight Carrier 1. Install the weight carrier (A, Figure 52) onto the front of the unit and secure with the 3/8-16 x 11/4" bolts (C), 3/8" washers (B) and 3/8-16" nylock flange nuts (G). NOTE: Use top holes in the weight carrier for the IS2OOOZ Series (as shown in Figure 52). 2. Install the counter weights (D) in the weight carrier and secure with the retaining pin (E) and hairpin clips (F). Figure 52. Install Weight Carrier A. Weight Carrier B.
WeightMountInstallation (J$45O()ZSepJes) InstalJ Weight Carrier 1. Support the front of the frame in the center of the unit with a jackstand. 2. Remove the 1/2-13 x 5" bolts (B, Figure 53) and 1/2-13 nylon lock nuts (C) securing the front suspension arms to the frame. 3. Install the weight carrier (A) onto the front of the unit and secure with the 1/2-13 x 5" bolts and 1/213 nylon lock nuts previously removed. 4.
Install Weight Carrier 1. Install the weight carrier (A, Figure 54) onto the front of the unit and secure with the 3/8-16 x 11/4" bolts (C), 3/8" washers (B) and 3/8-16" nylock flange nuts (G). NOTE: Use top holes in the weight carrier for the /S2OOOZ Series (as shown in Figure 54). 2. Install the counter weights (D) in the weight carrier and secure with the retaining pin (E) and hairpin clips (F). / // Figure 54. Install Weight Carrier A. Weight Carrier B. 3/8" SAE Washer C. 3/8-16X1-1/4" Bolt D.
mower & CoflectorRmoval 1. Remove the knobs (A, Figure 55) securing the deck guard top (B) to the deck guard. 2. Pull the blower idler arm lever (C) forward to release the belt tension and remove the belt from the spindle pulley. 3. Reinstall the deck guard top and secure with the knobs. Figure 55. Remove the Belt A. Knob B. Deck Guard Top C. Idler Arm Lever 4. Loosen the lower clamp securing the hose to the blower outlet and remove the hose from the blower. See Figure 56. 5.
mower & CoflectorRmoval 6. Reinstall the discharge chute (A, Figure 57) and secure with the supplied quick attach rod (B) and hairpin clips (C). 7. Empty the grass collector bags and reinstall in the bagger frame. Figure 57. Reinstall the Discharge Chute A. Discharge Chute B. Quick Attach Rod C. Hairpin Clip 8. Remove the hitch pins (B, Figure 58) securing the bagger mount posts (A) to the mount plate. 9. Lift the bagger unit up and off of the mount plate. Figure 58. Remove the Hitch Pins A.
ReglasEJnformcJdn DeSegurJdad Lea estas reglas de seguridad y sigalas con cuidado. Hacer caso omiso de elias puede ocasionar la p_rdida del control sobre la unidad, lesiones corporales graves o la muerte a usted o a los espectadores, o da_os a la propiedad o al equipo. Esta cubierta de la podadora puede arnputar rnanos y_pies y arrojar objetos. El tri_.
CalcomnJasde segurJdsd CALCOMANJAS DE SEGURIDAD Esta unidad fue diseffada y fabricada para brindarle seguridad y confiabilidad, caracterfsticas que usted esperarfa de un Ifder en [a industria de [a fabricaci6n de equipos motorizados para el exterior.
InstruccJonesgeneralesdeoperacJdn ANTES DE LA OPERACION Despeje el jardin de las ramas, piedras, alambres y otros despojos que puedan quedar atrapados en las cuchillas de la podadora o que puedan ser lanzados por las mismas. Revise la condici6n del pasto. SiestA hQmedo, espere hasta mAs tarde durante el dia. Si el pasto estA hQmedo, es probable que se obstruya el receptor de pasto.
InstruccionesgenersJes deoperscJbn DESPUES DE LA OPERACION Quite cualquier despojo de la pantalla en la parte inferior de la tapa. Nota: puede quitar parcialmente la pantalla de la tapa para limpiarla con mayor facilidad y debe hacerlo con regularidad. Debe quitar la caja del soplador y el tubo para limpiarlos. Inspeccione las bolsas de pasto para ver si presentan desgaste o da_os.
RmocJdndelsopladory receptor 1. Quite las perillas (A, Figura 59) y fije la parte superior de la guarda de la cubierta (B) a la guarda misma. 2. Jale hacia adelante la palanca del brazo tensor del soplador (C) para liberar la tensi6n de la correa y retirar la correa de la polea del huso. 3. Instale nuevamente la parte superior de la guarda de la cubierta y fijela con las perillas. Figura 59. Remoci6n de la correa A. Perilla B. Parte superior de la guarda de la cubierta C. Palanca del brazo tensor 4.
Remcidndelsoplsdory receptor 6. Instale nuevamente la tolva de expu}si6n (A, Figura 61) y sujetela con el brazo de sujeci6n r_pida (B) y los pasadores de horquilla (C), incluidos. 7. Vacie las bolsas del receptor de pasto e instAlelas nuevamente en la estructura. Figura 61. Nueva instalaci6n de la tolva de e×pulsi6n A. Tolva de e×pulsi6n B. Brazo de sujeci6n r_pida C. Pasador de horquilla 8.
STGrassCollectionSystems Briggs & Stratton Yard Power Products Group 5375 North Main Street Munnsviile, NY 13409 800-933-6175 www,ferrisindust ries,com