User manual

Instructions
47
EN
After carrying out any operation,
check that the tightening torque of
gas connections is between
10 Nm and 15 Nm.
At the end of the installation, check
for any leaks with a soapy
solution, never with a flame.
Have qualified personnel carry out
installation and assistance
interventions according to the
standards in force.
Have the electrical connection
performed by authorised
technicians.
The appliance must be connected
to ground in compliance with
electrical system safety standards.
Use cables withstanding a
temperature of at least 90 °C.
The tightening torque of the screws
of the terminal board leads must
be 1.5 - 2 Nm.
If the power supply cable is
damaged, contact technical
support immediately and they will
replace it.
Before any operation on the
appliance (installation,
maintenance, positioning or
movement) always wear PPM.
Before performing any operation
on the appliance, switch off the
power supply.
For this appliance
Ensure that the appliance is
switched off before replacing the
bulb.
Do not rest any weight or sit on the
open door of the appliance.
Take care that no objects are stuck
in the doors.
Do not install/use the appliance
outdoors.