
3. Assembly
The fitting plate is fixed into the work surface. It is then ready to receive,
in order :
1. the anti-emulsion oil bowl
2. the heating element, which you pivot on its hinge towards the bottom,
in order to position it in the bowl
3. the basket.
GB
27