Operation Manual

14GB
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre
of the area in which the hood will be installed.
Draw a horizontal line at:
965 mm above the hob for installation without the back panel,
965 mm above the surface on which the pack panel rests, for installation with the back panel.
Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning
the centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Mark a reference point on the horizontal reference line as indicated, 116 mm from the vertical
reference line.
Repeat this operation on the other side.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the brackets using the 12a screws (4,2 x 44,4) supplied.
Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-
6 mm between the wall and the head of the screw.
11
12a
965
X
116
1÷2
116
965 min.
7.2.1