Instruction manual
EN 
1
13 
11
12a
306
X
116
1÷2
116
650 min.
7.2.1
INSTALLATION 
Wall drilling and bracket fixing 
Wall marking: 
•  Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the 
centre of the area in which the hood will be installed. 
•  Draw a horizontal line at 650 mm above the hob. 
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit align-
ing the centre (notch) with the vertical reference line. 
•  Mark the wall at the centres of the holes in the bracket. 
• Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the 
upper chimney section supplied), aligning the centre (notch) with the vertical line. 
• Mark the wall at the centres of the holes in the bracket. 
•  Mark a reference point as indicated at 116 mm from the vertical reference line and 306 mm 
above the horizontal reference line. 
• Repeat this operation on the other side. 
• Drill ø 8 mm holes at all the centre points marked. 
• Insert the wall plugs 11 in the holes. 
• Fix the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4) supplied. 
•  Fix the upper bracket 7.2.1 and the air outlet connection support 7.3 together using the 2 
screws 12a (4,2 x 44,4) supplied. 
• Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap 
of 5-6 mm between the wall and the head of the screw. 










