Datasheet

17
Determining the Model and Settings 2 / Pulse DC Mode
Input
Input
ON
OFF
(Emission)
ON
OFF
ON
OFF
๎˜ Timing chart when electrode needle dirt is detected or ion balance is detected.
(a) When an auto-balance sensor is connected.
(1) Manual operation
Input
Input
Output
Input
Output
LED
Input
Input
Output
Input
Output
LED
ON
OFF
(Electrode needle stain-detection or ion balance adjustment in progress)
2 s
Over 100 ms
(Performed when the maintenance level
selection switch is set to H, M or L)
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
(b) When an auto-balance sensor is not connected.
(2) Automatic operation
Internal
processing
Dirt-detection
Ion balance adjustment
ON
OFF
2 s
Blinking
(Performed when the maintenance level
selection switch is set to H, M or L)
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
(Electrode needle stain-detection in progress)
Over 100 ms
ON
OFF
2 s
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
(Electrode needle stain-detection in progress)
Over 100 ms
High voltage irregularity
Sensor irregularity
CPU irregularity
Electrode needle
maintenance
(Operation permission)
Discharge
stop signal
State of
emitting ions
Power supply
24 VDC
(Operation permitted)
(Operation permitted)
(SW ON)
(SW ON)
(Display)
(Operation permitted)
(SW ON)
(SW ON)
(Display)
(SW ON)
(SW ON)
(Display)
Blinking
Blinking
Maintenance display
(NDL CHECK ALARM)
Discharge
stop signal
Static electricity removal
completion signal
Power supply
24 VDC
Maintenance
start signal
Input
Input
Output
Input
Output
LED
Maintenance
output signal
Maintenance display
(NDL CHECK ALARM)
Discharge
stop signal
Static electricity removal
completion signal
Power supply
24 VDC
Maintenance
start signal
Maintenance
output signal
Maintenance display
(NDL CHECK ALARM)
Discharge
stop signal
Static electricity removal
completion signal
Power supply
24 VDC
Maintenance
start signal
9) Alarm
Alarm item Description Corrective actions
10) Timing chart
๎˜ Timing chart during normal operation
Internal
processing
Dirt-detection
Ion balance adjustment
(Performed when the maintenance level
selection switch is set to H, M or L)
Internal
processing
Dirt-detection
Ion balance adjustment
: Either ON or OFF depending on the situation.
ยท A signal indicating static electricity removal completion is output when the detection of electrode needle dirt is in progress.
Ions are emitted from the ionizer to detect electrode needle dirt and the workpiece may therefore be electrostatically charged. Perform this detection
procedure in the absence of workpieces.
Caution
Maintenance
output signal
Ionizer Series IZS31
Gives notification of the occurrence of an abnormal current,
such as high-voltage leakage. The ionizer stops discharging,
turns on the HV ALARM display, and outputs a fault signal.
Turn off the power, solve the problem, then turn the power
on again. Alternatively, turn the discharge stop signal off,
then on.
Turn off the power, solve the problem, then turn the power
on again. Alternatively, turn the discharge stop signal off,
then on.
Turn off the power, solve the problem, then turn the power
on again. Alternatively, turn the discharge stop signal off,
then on.
Gives notification that the autobalance sensor is unable to
operate normally. The ionizer turns on the SNSR ALARM
display and outputs a fault signal.
Gives notification of the occurrence of a failure in the CPU
due to noise, etc. All of the LED displays blink and a fault
signal is output.
Gives notification that electrode needle maintenance is
necessary. The NDL CHECK ALARM display comes on and
a maintenance output signal is output.
Turn off the power, clean the electrode needles, and turn
the power on again.