Datasheet
12
473
Subject to change
SI UNITS, SYMBOLS AND DIMENSIONING
Individual control
of ejector and release
Switching between
vacuum and release
Switching between
vacuum and release
– on suction side
Common exhaust
Connection examples
Instructions
Supply connection (supply): Dimension supply line,
valves and connections considering the ejector’s air
consumption (see technical data).
Vacuum ejector (vac): the tubing between ejector
and vacuum pad should be as short as possible. Filters
should be installed for use in dusty environment (dust).
Ejector exhaust connection (exh): Type B – do not
block the silencer. Type D – do not connect longer tub-
ing that 0.5 meter (= pressure < 5 kPa).
Number of vacuum pads: One vacuum pad per
ejector for maximum safety.
EXH