User's Manual

I
NSTALLING
THE
S
WITCH
5
I
NSTALLING
THE
S
WITCH
Equipment Checklist
After unpacking the EZ Switch 10/100, check the contents of the
box to be sure you have received the following components:
EZ Switch 10/100 SMC-EZ109DT
Appropriate AC power cable
Four adhesive foot pads & rackmount kit
SMC Warranty Registration Card
•This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when
choosing a location:
Select a suitable location for the switch:
It should be accessible for installing, cabling and
maintaining the switch.
The temperature and humidity should be within the ranges
listed in the specifications.
The status LEDs should be clearly visible.
There should be adequate space (approximately two
inches) on all sides for proper air flow.
Make sure twisted-pair cable is always routed away from
power lines, fluorescent lighting fixtures and other sources of
electrical interference such as radios and transmitters.