OWNERS MANUAL Hub/Switch 24/16

I
NSTALLING
THE
S
WITCH
7
I
NSTALLING
THE
S
WITCH
The EZ Switch 10/100 can be placed on a desktop or shelf, or
installed in a standard 19-inch equipment rack.
Equipment Checklist
After unpacking the EZ Switch 10/100, check the contents of the
box to be sure you have received the following components:
EZ Switch 10/100 SMC-EZ1024FDT or SMC-EZ1016FDT
Appropriate AC power cable
Rackmount kit
Four adhesive foot pads
SMC Warranty Registration Card
•This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when
choosing a location:
Select a suitable location for the switch:
It should be accessible for installing, cabling and
maintaining the switch.
The temperature and humidity should be within the ranges
listed in the specifications.
The status LEDs should be clearly visible.
There should be adequate space (approximately two
inches) on all sides for proper air flow.