Installation Guide

Table Of Contents
4
Step 1: Begin
installation
working from left
to right. Insert
spacers at ends
and edges where
flooring meet
wall.
Step 2: Lock
short end of
flooringby
inserting tongue
into groove at an
angle and drop
in place. At end
of the row,
measure and cut
the flooring to
complete the
row. Install the
cut edge closest
to the wall.
Installation
III. INSTALLATION
Tools: Tape Measure, Utility Knife, Jigsaw, Tapping Block or Rubber Mallet, Pull Bar, ¼" Spacers, T-Square, Safety Glasses,
Broom or Vacuum and, if necessary, tools for subfloo
r repair.
FLOATING INSTALLATION
WPC flooring is designed to be installed utilizing the floating method. Proper expansion space 1/4(6.35 mm) is required. Undercut all
doorjambs. Do not fasten wall moldings and or transition strips to the flooring.
Glue Down Installation: WPC products are approved for glue down installation over approved wood and concrete substrates. Follow
adhesive label application instructi
ons. Install flooring into wet adhesive to achievea permanent bond. Maintain 1/4” (6.35 mm)
perimeter expansion space. Refer to adhesive label for moisture limits of the adhesive.Roll flooring immediately after installation with a
100 lbs. 3section roller.
Recommended Adhesive(s):Shaw 200 (or equivalent/comparable adhesive).
If alternative adhesives are used, a bond test should be performed to en
sure compatibility.
Flooring patterns must be installed in a staggered (offset) pattern.
LAYOUT
4
For reference purposes only if printed or downloaded.