Installation Guide
Step 1: Undercut
space under
door jamb to
allow flooring to
slide freely. Tap
long edge with
hammer and
tapping block to
lock long edge.
Step 2: Use
hammer and
pull bar to
lock this
piece of
flooring
Installation
Installing underneath door jambs:
COMPLETION
Protect all exposed edges of the flooring by installing wall molding and/or transition strips. Make sure that no plank will be
secured in any way to the subfloor.
For wet areas such as bathrooms caulk the perimeter of the floor with a flexible silicone caulk.
Protect the finished flooring from exposure to direct sunlight to reduce fading and thermal expansion.
Cutting resilient product into a fine point may lead to delamination. Use an ethyl cyanoacrylate based glue to help fuse the
resilient point together. Be sure to clean all glue from the top surface immediately. Alcohol based glues may cause resilient
products to swell.
Do not use tape to secure floor protection during construction or renovation.Use ram board or similar to protect the
floor.
6
For reference purposes only if printed or downloaded. Revision: 03182020