Specifications

6. Schedules, Tasks, Templates, RSS 39
(c) 2010 SmartAVI
figure 1
Second, you need to click on theproperties” of the Schedule and go to the Day and Time tab
on top. (figures 2 and 3). In the properties of the “Day and Time tab you can find a little box
that states “Run after power failure, check that box if you want this schedule to start by itself
even if the box is offline.