Installation Manual

Table Of Contents
Connecting the Network Cables
1. Plug one end of the network cable into the
network port B of the communication assembly.
A
B
L
N
100-240V
AC
0.88A
50/60Hz
SPS
A
B
D-IN
2. Plug the other end of the network cable into the
network port at the bottom of the Cloud Connect
Advanced.
TOP
FCC ID: SVF-KP
IC: 9440A-KP20
A
B
L
N
+
_
DC OK
+V DAJ
+
100-240V
AC
0.88A
50/60Hz
Connecting the Gateway
Requirements:
If several Gateways are present in the system, these have to be connected to each other prior
connection to the Cloud Connect Advanced.
A maximum of threegateways can be connected to one Cloud Connect Advanced.
5 Connection
SMA Solar Technology America LLC
Installation ManualRoofCommKit-P1-US-IA-xx-1120
ENGLISH