Installation Guide

To commission the Tigo equipment there are 3 simple steps that need to be completed:
1. NETWORK TEST
2. GATEWAY TEST
3. DISCOVERY
For systems with multiple Cloud Connect Advanced units, these tests need to be
performed on each individual Cloud Connect Advance .
Network and Gateway tests can run at the same time on different CCAs. However,
Discovery must be initiated on Cloud Connect Advanced one by one, making sure
GTWY discovery stage is complete before moving to the next one.
This may take several minutes to several hours depending on the size of the system.
Note:
The discovery process can be initiated for sites with more than 50 Smart Modules only
after the online configuration of the system has been completed and downloaded by
the Cloud Connect.
This step requires an Internet connection.
To Commission the system use your smartphone, download the Tigo SMART app and follow its instructions.
6. COMMISSIONING
19