Installation Guide
RS-485 communication cable is
recommended.
2 twisted pair, sunlight resistant or direct
burial
More Information:
• Gateway Hardware Guide
• Gateway Placement Guide
• Communication Cable Guide
Locate Gateway near center of array or
each sub-array
Gateway attaches to module frame
using provided bracket
50ft (15m)
Installation:
1. Connect all GTWY cables before
powering on Cloud Connect
2. Install GTWY on back of PV module
using provided bracket or bolt to the
racking system
3. Power on Cloud Connect Advanced
and perform Gateway test from
Tigo SMART App
3. INSTALLING GATEWAYS (GTWY)
10
Place GTWY on back of PV
module or racking system
1
Run a RS-485 wire from the
CCA to the first GTWY
2
Connect multiple Gateways in
series and leave terminating
resistor only in final Gateway.
3