Operation Manual

Layout of the installation assistant
A
C
B
Figure 3: Layout of the installation assistant
Position Designation Description
A Configuration steps Overview of the installation assistant steps. The number of
steps depends on the type of device and the additionally
installed modules. The current step is highlighted in blue.
B User information Information about the current configuration step and the
setting options of the configuration step.
C Configuration field You can make settings in this field.
Requirement:
When configuring after completion of the first ten operating hours, the SMA Grid Guard code
must be available (see "Application for SMAGridGuard Code" at www.SMA-Solar.com).
Procedure:
1. Activate the user interface (see Section5.1, page20).
2. Log in as Installer.
3. Select the menu User Settings (see Section5.3, page25) on the start page of the user
interface.
4. In the context menu, select [Start the installation assistant].
The Installation Assistant will open.
5 Using the Inverter User Interface
SMA Solar Technology America LLC
User ManualSB30-77-1SP-US-40-BA-en-1128