Sunny Boy User Manual

4 Operation
SMA Solar Technology AG
User ManualSBxx-US-1XP-41-BA-en-1136
4. The PV system's output is too low when: the green LED does not flash and no message that the
secure power supply operation mode is enabled appears on the display or the control lamp of
the outlet does not glow. Irradiation on the PV system is probably too low or the connected
load requires more power than currently available. Carry out the following measures:
Ensure that the outlet's switch is set to secure power supply operation.
If irradiation is too low, wait for it to increase.
Connect a load with lower power consumption to the outlet.
5. If no voltage can be measured at the outlet, ensure that the switch of the outlet is set to secure
power supply operation, and that the switch, outlet and control light for secure power supply
operation are correctly connected.
4.8.2 Disable secure power supply operation
1. If necessary, disconnect the load from the outlet.
2. Turn the switch of the outlet to grid operation.
Grid operation is activated.
3. Switch on the circuit breaker of the PV system.
The inverter connects to the utility grid and starts feed-in operation.
4.9 Activate WPS Function
The WPS function can be used for different purposes:
Automatic connection to a network (e.g. via router)
Direct connection between the product and an end device
Depending on the intended application of the WPS function, the procedure for activation will vary.
Activating WPS function for automatic connection to a network
Requirements:
WLAN must be activated in the product.
WPS must be activated on the router.
Procedure:
1. Activate the user interface (see Section4.2, page24).
2. Log in as Installer.
3. Start the installation assistant (see Section4.7, page34).
4. Select Network configuration.
5. Select WPS for WLAN network button in the WLAN tab.
6. Select Activate WPS.
7. Select Save and next and exit the installation assistant.
The WPS function is activated and the automatic connection to the network can be
established.