Installation Manual
Requirements:
☐ The technical requirements of the multifunction relay must be met (see Section10 "Technical
Data", page60).
☐ All electrical installations must be carried out in accordance with the local standards and the
National Electrical Code
®
ANSI/NFPA 70 or the Canadian Electrical Code
®
CSA C22.1.
Requirements for the conductors:
• Conductor cross-section: 0.2mm² to 1.5mm² (24AWG to 16AWG)
• The conductor type and wiring method must be appropriate for the application and location.
Procedure:
1.
Danger to life due to high voltages
• Ensure that the inverter is disconnected from all voltage sources (see Section8, page56
).
2. Remove the sealing plug from the enclosure opening on the multifunction relay.
3. Insert the conduit fitting into the opening and tighten from the inside using the counter nut.
4. Attach the conduit to the conduit fitting.
5. Guide the conductors from the conduit into the inverter.
6. Strip off the conductor insulation by max. 9mm (0.35in).
7. Connect the conductors to the plug according to
the circuit diagram, depending on the operating
mode (see Section6.5.3, page37). When
doing so, ensure that the conductors are
completely plugged into the conduit entries up to
their insulation.
8. Stick the plug into the MFR slot on the
communication assembly in the inverter.
D-IN
SPS
A B
FCC ID: SVF-KP20
IC: 9440A-KP20
Max. 30V DC
DISPLAY
BAT MFR
USB
MFR
Max. 30V DC
USB
BAT
9. Ensure that the plug is securely in place.
10. Ensure that all conductors are correctly connected.
11. Ensure that the conductors sit securely in the terminals.
Useful hint: To release the conductors from the plugs, open the conduit entries using a suitable
tool.
6 Electrical Connection
SMA Solar Technology America LLC
Installation Manual 41SB30-77-1SP-US-40-IA-xx-13
ENGLISH