Owner manual

CHS 85-399 CHS Floor Stand Installation Instructions Slant Fin Corp.
4
Boiler Mounting Instructions (Steps 5- 9)
6. Remove the Wall-Mount Bracket (B) from
the back of the boiler and discard; keep the
screws for use in step 8. Upper Bracket (A)
remains on the boiler.
Wall-Mount
Bracket (B)
Upper Bracket (A)
7. With the help of an assistant, hook the Upper
Bracket (A), mounted to the boiler, onto the Top
Cross Member of Floor Stand ensure the bracket
fully engages. See Reverse View.
Upper bracket (A) hooked
over Top Cross Member
Reverse View (Step 7)