® US This manual must be left with owner and should be hung on or adjacent to the boiler for reference. HIGH EFFICIENCY FIRE TUBE CONDENSING GAS BOILER MODELS CHS-85 through CHS-399 INSTALLATION AND OPERATING INSTRUCTIONS IMPORTANT READ ALL OF THE FOLLOWING WARNINGS AND STATEMENTS BEFORE READING THE INSTALLATION INSTRUCTIONS ! DANGER ! WARNING ! CAUTION Danger Sign: Indicates a hazardous situation which, if not avoided, will result in serious injury or death.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Read Before Proceeding If you do not follow these instructions exactly, a fire or explosion may result causing property damage, serious injury or death. FOR YOUR SAFETY, READ BEFORE OPERATING_ A) This boiler does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand. B) BEFORE OPERATING smell all around the boiler area for gas.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 1.0 INTRODUCTION General Installation Requirements The installation of your Slant/Fin CHS gas boiler must conform to the requirements of this manual, your local authority, and the National Fuel Gas Code ANSI Z223.1 and or CAN/CGA B149 Installation Codes. Where required by the Authority, the installation must conform to the standard for “Controls and Safety Devices for Automatically Fired Boilers ANSI/ASME CSD-1.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series CHS boilers are factory set to operate with Natural Gas; BEFORE OPERATING WITH PROPANE, the boiler must be converted using the appropriate Natural Gas to LP Conversion Kit; see below. Failure to properly convert the unit to safely operate with Propane will cause dangerous burner operation, resulting in property damage, serious injury or death.
CHS Series Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 2.0 SPECIFICATIONS Table 2-1 CHS Specifications DESCRIPTION CHS-85 CSA Input Modulation 1,4 17-85 [MBH] DOE Heating Capacity 1,2 78 [MBH] CHS-110 CHS-154 CHS-175 CHS-200 CHS-250 CHS-340 CHS-399 21.6-108 15.4-154 31-175 31-200 31-250 39.9-340 39.9-399 99 141 163 185 230 324 380 122 141 160 199 282 330 Net I=B=R Rating 1,2 68 86 [MBH] DOE AFUE2 [%] Water Connections – NPT 1 (Male) [in.] Gas Connection - NPT, in.
CHS Series Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 3.0 BOILER LOCATION In all cases, the CHS boiler must be installed indoors in a dry location where the ambient temperature must be maintained above freezing and below 100F [38C]. All boiler components must be protected from dripping, spraying water, or rain during operation and servicing.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Table 3-1 Minimum Clearances for Installation and Service Model No. Clearances Minimum Recommended CHS 85-399 Front 24 [610] 1 36 [914] Top 12 [305] 24 [610] Dimensions - inches [mm] Sides Back Bottom 4 [102] 0 16 [407] 12 [305] 0 24 [610] Flue Pipe 1 [25] 1 [25] Notes: 1 6” if surface is removable allowing a minimum of 24” [610 mm] clearance (i.e. closet installation). See Ventilation Air Opening dimensions in Figure 3-1.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Figure 3-2 Wall Mounting Instructions While leaving the Upper bracket (A) intact, remove the Wall-mount bracket (B) attached to the bottom-back of the appliance. Save the mounting hardware for Step 4.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 4.0 GENERAL VENTING The CHS boiler is certified as a “Category IV” boiler requiring a “Special Venting System” designed for pressurized venting. The Exhaust Vent must be piped to the outdoors, using the vent materials and rules outlined in this section. Under no conditions may this unit vent gases into a masonry chimney, unless it is vacant, and utilizes the approved venting material and rules described in this section.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Direct Vent Installation When installed as a Direct Vent boiler the combustion air-inlet must also be piped directly to the outdoors using the methods described in this section and in accordance with the National Fuel Gas Code, ANSI Z223.1 (U.S.) or CSA B149.1 (Canada) and local requirements. Installation Using Indoor Combustion Air When the installation uses Indoor Combustion Air (i.e.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Mandatory Pre-commissioning Procedure for Plastic Venting (PVC or CPVC) Do not apply power to the boiler prior to Step 4 in the Mandatory Pre-commissioning Procedure for Plastic Venting. 1) Working with the power turned off to the boiler, completely install the vent and air intake system, securely cementing joints together. If possible, allow primers/cements to cure for 8 hours before firing the burner.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Figure 4-2 Universal Exhaust-vent & Air-inlet Appliance Adapter (CHS-154 only) Gasket Identification and Pipe Insertion Depth Upper Gasket – 3.5” OD Seal use with CPVC (PVC for Air-inlet) 2.36” (CPVC/PVC) 3.46” (PP) Middle Gasket – 3.14” OD Seal use with Polypropylene 4.17” (SS) Lower Gasket – 3” OD Seal use with Stainless Steel Table 4-2 CPVC Vent Pipe Transition Piece (used when venting with PVC) Model No.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Vent/Air-inlet Pipe Material Table 4-4 Acceptable Vent and Air-Inlet Pipe Material Venting System Standards 2, 3 Items 1 Materials 4 Canada United States PVC - DWV ANSI/ASTM D2265 PVC Schedule 40 ANSI/ASTM D1785 All venting material in Vent Piping CPVC Schedule 40 ANSI/ASTM F441 Canada must be and Fittings Stainless Steel (SS) UL-1738 ULC S636 approved.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Termination Options – Direct Vent Installation The venting system of the CHS may be terminated using field supplied piping to construct a “Two-Pipe” termination, see Figures 4-4(a), 4-5(a), 4-5(d), 4-6(a), 4-7(a) and 4-7(d); alternatively the venting may be terminated using a factory kit selected from Table 4-7.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Sidewall Venting Options – Direct Vent Installation Figure 4-4(a) Two-pipe Termination (Sidewall) Figure 4-4(b) IPEX Low Profile Termination (Sidewall) Location of exhaust and air-inlet connections vary between models, see Figure 4-2. (model CHS 85-110 shown) Location of exhaust and air-inlet connections vary between models, see Figure 4-2.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Roof Venting Options – Direct Vent Installation Figure 4-5(a) Two-pipe Termination (Roof) Figure 4-5(b) IPEX Concentric Termination (Roof) Location of exhaust and air-inlet connections vary between models, see Figure 4-2. (model CHS 85-110 shown) Location of exhaust and air-inlet connections vary between models, see Figure 4-2.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Sidewall Termination Details – Direct Vent Installation Figure 4-6(a) Two-Pipe Termination (Sidewall) Figure 4-6(b) IPEX Concentric Termination (Sidewall) Horizontal 4-12” or greater than 36” Refer to documentation included with termination kit for complete installation instructions. Exhaust Exhaust Exhaust Air-inlet Vertical Min.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Roof Termination Details – Direct Vent Installation Figure 4-7(a) Two-Pipe Termination (Roof) Exhaust Vent Screen Figure 4-7(b) IPEX Concentric Termination (Roof) Refer to documentation included with termination kit for complete installation instructions. Vent pipe piece to retain vent screen Air-inlet Vent pipe piece to retain vent screen Exhaust center Vent Screen Vertical Min. 18” Min. 12” above grade or snow level Min.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Venting Rules and Guidelines 1. Prevailing Winds: Ensure the vent is located where it will not be exposed to normal prevailing winds. 2. Combustion Air-inlet Contamination: Air for combustion must be drawn from an area free of dust and contaminants. Combustion air containing chemicals such as chloride, fluoride, bromine or iodine or dust and debris will cause corrosion damage of the heat exchanger voiding your Slant/Fin warranty.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Figure 4-8 Venting Below Grade For installations that exit the wall below grade: 1. 2. 3. 4. 5. Excavate site to a point below where the pipes are to exit as shown. Ensure the wall is fully sealed where the pipes penetrate. The Vent/Air-inlet piping MUST be secured to the side of the building above grade, as shown, to provide rigidity. Optional mounting bracket PN.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 5.0 VENT/AIR-INLET TERMINATION CLEARANCES The quick reference table below is to be read in conjunction with the numbered notes as indicated, Figures 5-1 and 5-2, and the Venting Rules and Guidelines in Section 4.0. The instructions detailed in this section are a combination of CHS specific and National Gas Code restrictions. Compliance alone doesn’t insure a satisfactory installation as good common sense must also be applied.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Figure 5-1 Termination Clearance Quick Reference Diagram (See Table 5-1) Illustrations of Termination Clearances Figure 5-2 Sidewall Termination (See Table 5-1) Clearances “F” and “G” Canada – Minimum 3 ft [915 mm] The US – Minimum 1 ft [305 mm] Two-Pipe Termination F Clearance “Q” Adjacent to Public Walkway or Driveway Minimum 7ft [2.13 m] G Q Concentric Vent Termination G – Letter represents a specific Termination Position.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 6.0 CONDENSATE DRAIN This unit produces liquid condensate in the heat exchanger and venting system as a product of combustion. Steps must be taken to ensure condensate does not collect in the venting system; therefore, all exhaust piping must slope back to the boiler a minimum 1/4” per linear foot of vent. Condensate must be drained from the unit into a household drain.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Figure 6-1 Condensate Drain Piping Inspect Condensate Trap assembly Boiler Condensate Drain Hose Clamp (factory supplied) Condensate Trap (factory supplied) Attach to Boiler Condensate Drain Tighten hose clamps and pull down on Condensate Trap to test secureness Pipe Outlet to Drain Direct condensate to a vented drain; ensure no strain is applied to the Condensate Trap and Boiler Condensate Drain.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 7.0 INSTALLING GAS PIPING CHS boilers are factory set to operate with Natural Gas; BEFORE OPERATING WITH PROPANE, the boiler must be converted using the appropriate Natural to LP Conversion Kit; see Table 7-1. Failure to properly convert the unit to safely operate with Propane will cause dangerous burner operation, resulting in property damage, serious injury or death. Liquefied Petroleum (LP) propane gas is heavier than air.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Strain on the gas valve and fittings may result in vibration, premature component failure and leakage and may result in a fire, explosion, property damage, serious injury or death. Do not use an open flame to test for gas leaks. Failure to follow these instructions may result in fire, property damage, serious injury or death.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 8.0 LIGHTING THE BOILER Before Start-up refer to Mandatory Pre-commissioning Procedure for Plastic Venting in Section 4.0. Failure to follow these instructions can result in explosions, injury or death.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. The initial lighting of the boiler must be performed by a licensed Gas Technician. Failure to follow instructions may result in property damage, serious injury or death. Ensure the boiler is wired in accordance with this manual. Ensure the gas shutoff valve is turned on, and that the gas system has been fully tested for leaks. Ensure the system is completely filled with water, and that ALL the air is purged out.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 9.0 GAS VALVE AND BURNER SET-UP Set-up of the CHS gas valve must be performed by a licensed Gas Technician. Failure to perform the set-up correctly may result in incorrect operation, component failure, property damage, serious injury or death. Gas Line Pressure The boiler gas valve is equipped with a line pressure test port; see Figures 9-1 to 9-3.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Table 9-2 Minimum and Maximum Modulation Rates Model Min. Modulation Rate (RPM) Max.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Flue Gas Analysis and Adjustment Each CHS boiler is factory set to operate with Natural Gas, for boilers field converted to operate with Propane Gas, a flue gas analysis and adjustment is mandatory. See Table 7-1 and Propane conversion instructions.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Figure 9-2 CHS-154 Gas Valve Adjustment DO NOT Adjust Gas Valve Throttle / Input Adjustment Screw Line Pressure Test Port Figure 9-3 CHS 340-399 Gas Valve Adjustment Remove access cover, adjust from top.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 10.0 BOILER AND HEATING SYSTEM PIPING The fire tube design of the CHS heat exchanger results in minimal head loss, however it must be considered when sizing system piping and circulators. Furthermore, the low mass of the CHS heat exchanger requires a minimum flow rate anytime the burner is operating.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Dirt Removal – A dirt removal device should be installed in all systems. In older systems containing cast iron radiators/baseboard or large amount black iron or steel pipe a magnetic dirt separator must be installed.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Near Boiler Plumbing CHS boilers are intended solely for use in pressurized closed-loop heating systems operating with a minimum pressure of 15 PSI at the boiler outlet. Carefully follow the instructions and piping diagrams illustrated in this section. The CHS boiler is not approved for operation in an “open system”, thus it cannot be used for direct potable water heating or process heating of any kind.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Near Boiler Piping (CHS 85-154) Figure 10-1(a) Supply/Return Bottom (CHS 85-154) Figure 10-1(b) Supply/Return Top (CHS 85-154) Auto Air-Vent (factory Supplied) Auto Air-Vent (factory Supplied) Inlet Pressure Relief Valve (factory Supplied) Pressure Relief Valve (factory Supplied) Press. & Temp. Gauge (factory Supplied) Outlet Press. & Temp. Gauge (factory Supplied) Outlet Pressure Relief Valve (alt.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Near Boiler Piping (CHS 155-250) Figure 10-2(a) Supply/Return Bottom (CHS 155-250) Auto Air-Vent (factory Supplied) Figure 10-2(b) Supply/Return Top (CHS 155-250) Auto Air-Vent (factory Supplied) Inlet Pressure Relief Valve (factory Supplied) Pressure Relief Valve (factory Supplied) Outlet Press. & Temp. Gauge (factory Supplied) Pressure Relief Valve (alt. location – check local installation codes) Pressure Relief Valve (alt.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Near Boiler Piping (CHS 300-399) Figure 10-3(a) Supply/Return Bottom (CHS 300-399) Auto Air-Vent (factory Supplied) Pressure Relief Valve (factory Supplied) Figure 10-3(b) Supply/Return Top (CHS 300-399) Auto Air-Vent (factory Supplied) Inlet Pressure Relief Valve (factory Supplied) Outlet Inlet Press. & Temp. Gauge (factory Supplied) Press. & Temp. Gauge (factory Supplied) Outlet Pressure Relief Valve (alt.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Boiler System Plumbing The CHS boiler uses a low mass heat exchanger that requires a minimum rate of forced water circulation any time the burner is operating (See Table 10-2 for minimum flow rate requirements).
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Table 10-4 Circulator and Pipe Size Requirements Temp. Boiler Flow Boiler Head Minimum Model Rise (ºF) Rate (GPM) Loss (ft) Pipe Size CHS85 20 25 35 8 6 4 3.4 2.7 1.6 1” 1” ¾” Minimum Primary Loop Pump Size(1) B&G Grundfos Taco Armstrong NRF-22 UPS15-58 0015-MS Astro 30 NRF-22 UPS15-58 0015-MS Astro 30 NRF-22 UPS15-58 0015-MS Astro 30 CHS110 20 25 35 10 8 6 3.9 3.4 2.
Slant Fin Corp.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Air Removal – The boiler and system plumbing layout must be configured to promote the removal of air from the water. Air vents and bleeders must be strategically placed throughout the system to aid in purging the air from the system during commissioning of the boiler.
Slant Fin Corp. │ Installation and Operation Instructions Figure 10-5 Primary/Secondary Plumbing (Single System Circulator Configuration) Water connection locations will vary between boiler models; refer to Figures 10-1 to 10-3.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. Figure 10-6 Primary/Secondary Plumbing (Multiple System Circulator Configuration) Water connection locations will vary between boiler models; refer to Figures 10-1 to 10-3.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Multiple Boiler Applications The CHS controller has the internal capacity to stage or Lead-Lag up to 8 boilers configured in a cascade. This Lead-Lag capability allows a designated “Master” boiler to communicate with and effectively control each boiler in a multiple boiler system. This function is accomplished by “Daisy Chaining” a 3-wire cable between each of the boilers and enabling the Master parameter in the boiler of your choice.
Installation and Operation Instructions │ Slant Fin Corp. Figure 10-7 Multiple Boiler Lead-Lag Plumbing Configuration (Small DHW Requirements) Water connection locations will vary between boiler models; refer to Figures 10-1 to 10-3.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Water connection locations will vary between boiler models; refer to Figures 10-1 to 10-3.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 11.0 FIELD WIRING All wiring must be in accordance with the Canadian Electrical code, CSA C22.2 and any applicable local codes. Ensure that the wiring complies with this manual. The boiler must be electrically grounded in accordance with the National Electrical Code ANSI/NFPA 70, local codes, and/or the Canadian Electrical Code CSA C22.1.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Figure 11-1 Line Voltage Field Wiring Table 11-1 Line Voltage Field Connections Connection Location Description L1 Location for connecting line voltage of the power supply. Note; most installation codes 1 (120VAC) require the installation of a service switch to break line voltage to the appliance. PUMP A 2 PUMP B 3 PUMP C 4 L2 (Neutral) 5 120VAC output to the DHW circulator; powered during a demand for DHW.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Low Voltage Connections Like the line voltage, the low voltage wiring connections to the CHS boiler are made at the junction box in the control panel located at the bottom of the boiler cabinet. The connections are accessed by removing the front door of the boiler, followed by the removal of the control panel cover. Field connections are to be installed in accordance with Figure 11-2 and Tables 11-2a and 11-2b.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Low Voltage Terminals – “R” terminals 2 and 3 of the 24VAC I/O barrier has 24VAC potential from the internal transformer. Do not connect power from this terminal to any other terminal other than terminals 4, 5 and 6 (LIM, CH1 and CH2 (LL)). Failure to follow these instructions may damage the unit. The low voltage connections are divided into two separate barrier strips: Communication and Sensor I/O (Input/Output) and 24VAC I/O.
CHS Series Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions 12.
CHS Series Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 13.0 INSTALLATION CHECKLIST Installation 1. If operating on Propane Gas, convert boiler using appropriate Natural to LP Conversion Instructions; see Table 7-1. 2. Locate the boiler in accordance with Section 3.0 of this manual. 3. Install the Vent/Air-inlet piping in accordance with Sections 4.0 and 5.0 of this manual. Ensure all joints are secured and cemented properly. Both the Vent and Air-inlet pipes must terminate outdoors.
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 14.0 ANNUAL MAINTENANCE AND INSPECTION This unit must be inspected at the beginning of every heating season by a Qualified Technician. Annual Inspection Checklist 1. Lighting is smooth and consistent, and the combustion fan is noise & vibration free. 2. The condensate drain freely flows, and is cleaned of sediment. 3. Relief Valve and air vents are not weeping. 4.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Refractory Ceramic Fibers (RFC) Personal Protective Equipment Recommended - Read the following warnings and handling instructions carefully before commencing any service work in the combustion chamber. The insulating material on the inside of the burner plate contains Refractory Ceramic Fibers and should not be handled without personal protective equipment.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series 15.0 TROUBLESHOOTING Observe the following precautions when servicing the boiler. Failure to comply with these may result in fire, property damage, serious injury or death. Servicing the Boiler Disconnect or shutoff all energy sources to the boiler: 120VAC power, water and gas. Identify and mark wires before disconnecting or removing them. Never bypass electrical fuses or limit devices except temporarily for testing.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Figure 15-1 CHS Control Panel Figure 14-1 Tft Model Fuse “C” ATO 2A 32V Auto Blade Type Fuses “A” and “B” 3AG 7A 250 Fast-Acting Control Panel Cover Control Panel Fuses The CHS boiler is equipped with three (3) fuses. Check these fuses before replacing the controller or any other electrical component; if the fuse is blown, it will prevent the protected device(s) from functioning.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Loss of Communication If the Display is not blank, but is displaying “Boiler Search, Modbus address: 1,2,3…” indefinitely, ensure the Molex connector, located behind the display at the top, is connected and that the wires are fully inserted (see Figures 15-2 and 15-3).
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Display Diagnostics – The CHS controller and user interface provide detailed operational and diagnostic information for aid in troubleshooting. When power is applied to the boiler the initial screen displayed is the Home page. Information presented on the Home page includes Demand, State, status of sensors, and so forth. Any current Alert or Lockout condition is also displayed.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Table 15-1 Troubleshooting Chart PROBLEM Hold 63 – LCI OFF (Limit control input) Hold 65 – Interrupted Air Switch OFF Hold 66 – Interrupted air switch ON Hold 67 – ILK OFF POSSIBLE CAUSE Incorrect Sola controller. Replace control with correct model. Low Water Condition External Limit Tripped Check operation of internal LWCO. Indication that an external limit (wired to “LIM”) is open. Not a problem with boiler, check external limit.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Table 15-1 Troubleshooting Chart PROBLEM Hold 92 – Outlet sensor fault POSSIBLE CAUSE Sensor disconnected Faulty sensor Hold 95 – Stack sensor fault Sensor disconnected Faulty sensor Lockout 109 or Hold 110 – Ignition failure occurred (failure to prove flame after 3 ignition attempts) Spark cable disconnected Blocked venting Blocked condensate drain.
Installation and Operation Instructions │ Slant Fin Corp. CHS Series Table 15-1 Troubleshooting Chart PROBLEM Lockout 122 – Lightoff rate proving failed Alert 128 - Modulation rate was limited due to IAS open Hold 137 – ILK failed to close Lockout 138 – Flame too low POSSIBLE CAUSE Blower is not turning on See “Blower not operating” below. Missing or incorrect blower feedback signal Blower is always on See Hold 62 above. Incorrect Sola controller.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE Inoperative CH and/or DHW pump CORRECTIVE ACTION Blown fuse Check Fuse "B". Faulty Sola controller If Fuse “B” not blown, and Sola controller is operating, navigate to pump diagnostic on display. Manually switch pump on, check for 120VAC at pump connection terminal on line voltage barrier strip. If 120VAC not detected, replace Sola controller.
CHS Series Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
CHS Series Table 15-4 Code 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82-83 84 85 86 87 88 89 Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions Table 15-4 Code 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 78 Alert Codes Description Modulation output type was invalid Firing rate control parameter was invalid Forced rate was out of range vs. min/max modulation Forced rate was invalid, % vs.
CHS Series Table 15-4 Code 139 140 146 147 148 149 151 152 155 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
CHS Series Table 15-4 Code 247 248 249 250 251 252 253 254 255 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
CHS Series Table 15-4 Code 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384-388 389 390-447 448 449 450 451 452 453 454 455 456 457 Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
CHS Series Table 15-4 Code 604 605 606 609 610 611 612 613 614 615 616 622 623 624 629 Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 16.0 PARTS LIST For a list of parts that corresponds to the item numbers in the callouts, refer to Table 16-1. Note that some item numbers may appear more than once in the parts list depending on which model number is being referenced. Building Owners - Replacement parts are available from your stocking wholesaler. Contact your local Installer or Wholesaler for assistance with parts.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp.
Slant Fin Corp.
Installation and Operation Instructions │ Slant Fin Corp.
©Slant/Fin Corp. 2017 • 917 • PUBLICATION CHS-40 SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600 FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LTEE, Mississauga, Ontario www.slantfin.