Communication Protocol

47 / 50
Copyright (c) 2009-2013 RoboPeak Team
Copyright (c) 2013-2019 Shanghai Slamtec Co., Ltd.
∆T. The interval time represents how long the RPLIDAR has spent to perform a 360
o
scan. So the actual scan speed can be calculated using the following equation:
RPM =
1
∆𝑇
60
The calculated value can be used as a feedback to control the motor speed.