User's Manual

Installation Manual GLS 400 Aluminum Roof Trailer 9
8. Apply the 3M Primer 94 (Item #5) to the cleaned and abraded mounting
surface where the Skybitz brackets will be mounted. Allow the primer at
least 2 minutes to dry completely.
9. Remove the plastic film from the bracket VHB tape to expose the VHB tape
adhesive surface. Be careful not to touch the exposed adhesive or primed
surface as any contamination will impede the bond strength. Carefully
place the MT/Bracket assembly on the roof so the brackets align with the
prepared mounting areas. Firmly push down, back and forth several
times, along the entire length of each bracket. Visually verify a bond has
been obtained between the bracket and the roof.
10. Firmly pull up on the MT/Bracket assembly, to verify a secure bond to the
roof of the trailer, before releasing the trailer into service.
11. Complete the Installation Registration form found in the back of this
manual!