Installation Instructions
Table Of Contents

GLS MT Installation
4/1/2004 VER 2.8 DOC
5
Partially install the screws leaving the MT free to move in the
bracket.
2. Locate two rivets in the roof, about 3 ft. back from the front of the
trailer, along the left road-side roof rail. Mark and drill a 3/16” hole
between the two rivets to create a mounting point for the Safety
Tether. Install the 10-24 x 1” long screw through the tab in the tether
and fasten to the trailer with the #10 flat washer and 10-24 lock nut.
Orient the tether mounting tab as shown in the photo and tighten.
3. Before removing the plastic film to expose the VHB tape adhesive, set
the MT Bracket in place on the roof of the trailer. Locate the MT
bracket assembly approximately 12” from the side of the trailer as
shown. The open end of the bracket and the MT connector should be
facing the rear of the trailer. Apply the masking tape to the trailer roof
around the outside of the bracket and Tether to form a template.
Move the MT bracket assembly aside.
FRONT
Place the MT
on the roof
about 1ft from
the
edge
Use masking tape to
create a tem
p
late
1ft
Tether
attachment
detail
FRONT
Mark and drill
for Tether
Attachment
point
FRONT
Measure 3ft
back from
the front
FRONT
1. Clean
2. Abrade
3. Clean
4. Prime