Instructions / Assembly

2
For Reference
Once the bottom rail is secure, you can insert the pickets into the holes of the bottom rail. Please note that all
pickets are crimped (notched). Make sure that the crimp that is 1 5/16” from the bottom of the pickets goes into
the bottom rail.
5. Top Rail
Once all the pickets are in place, you can install the top rail. The steel insert for the top & bottom rail should
already be inside (make sure that the insert’s opening faces upward, see Fig.4). Place the brackets over the rail
ends, then position it between the posts and over the pickets. Push it down firmly into place. Verify that the
section is level and screw the brackets to the posts (refer to instruction sheet “A” in supplied screw bag). Install
the other sections in the same manner, one section at a time.
6. Finishing Touches
Install the two pieces base moldings at the bottom of the posts.
Use PVC glue or silicone caulking to attach the caps.
Fig.1 Fig.2 Fig.3
Fig. 4