User's Manual Part 1
Table Of Contents
- Instruction Book Introduction
- Customer Service
- Technical Assistance Center
- Sections 1-6
- Section 1 General
- Section 2 Functional Description
- 2.1 General
- 2.2 System Functional Overview
- 2.3 Main Functions
- 2.3.1 Signal Processing Unit (SPU) Sub-assembly
- Figure 2 - 2 Signal Processing Unit (SPU)
- Figure 2 - 3 Sirius Signal Processing Unit (SPU) Functional Block Diagram
- Figure 2 - 4 VSAT (L-Band) Receiver Panel
- Figure 2 - 5 Modulator Module
- Figure 2 - 6 Up-Converter Module Panel
- Figure 2 - 7 Controller Board Panel
- Figure 2 - 8 Main Controller Board Functional Block Diagram
- Figure 2 - 9 Uninterruptible Power Supply (UPS)
- 2.3.1 Signal Processing Unit (SPU) Sub-assembly
- 2.4 High Power Amplifier (HPA)
- 2.5 S-Band Output Filter
- 2.6 Output Coupler
- 2.7 Power Distribution
- 2.8 Junction Box Assembly
- Section 3 Installation
- 3.1 Introduction
- 3.2 Safety On Site
- 3.3 INSTALLATION OVERVIEW
- 3.4 SITE POWER
- 3.5 REPEATER UNPACKING AND INSPECTION
- 3.6 SUGGESTED TOOL LIST
- 3.7 ANTENNA INSTALLATION
- 3.8 REPEATER CABINET INSTALLATION
- 3.9 CABLE CONNECTIONS (see Figure 3 - 2)
- 3.10 POST-INSTALLATION INSPECTION/TEST
- 3.11 Post Installation Inspection/Test Form
- Section 4 Turn-Up and Testing
- 4.1 General
- 4.2 Test Equipment Required
- 4.3 Repeater Provisioning
- 4.4 Field Tests
- 4.5 Connect Repeater System to NMC
- 4.6 Field Test Report
- Section 5 Operation
- 5.1 GENERAL
- 5.2 Control and Communication
- 5.3 Modes of Operation
- 5.4 GRAPHICAL USER INTERFACE (GUI)
- 5.5 GUI Menu Descriptions
- 5.5.1 Status Sub-Menu Breakdown
- 5.5.2 Configuration (Config) Sub-Menu Breakdown
- Figure 5 - 7 GUI Main Menu Config Drop-Down Menu
- Figure 5 - 8 Config Modulator Sub-Menu
- Figure 5 - 9 Repeater ID Screen
- Figure 5 - 10 Modulator Mode Screen
- Figure 5 - 11 Overlay Screen
- Figure 5 - 12 Delays Screen
- Figure 5 - 13 Modulator IP Screen
- Figure 5 - 14 VSAT Screen
- Figure 5 - 15 Repeater Output Level Screen
- Figure 5 - 16 Coupler Screen
- Figure 5 - 17 GPS Screen
- Figure 5 - 18 Temperature Screen
- Figure 5 - 19 Repeater Operating Mode Screen
- Figure 5 - 20 PPP Dial In Parameters Screen
- Figure 5 - 21 PPP Dial Out Parameters Screen
- Figure 5 - 22 PPP Misc Parameters Screen
- Figure 5 - 23 Site Screen
- 5.5.3 Alarms Sub-Menu Breakdown
- 5.5.4 NMS Users Sub-Menu Breakdown
- 5.5.5 System Parameters Menu
- Figure 5 - 28 Access to System Parameters Sub-Menu
- Figure 5 - 29 System Parameters Identification Screen
- Figure 5 - 30 System Parameters Access Control Screen
- Figure 5 - 31 System Parameters Network Parameters Screen
- Figure 5 - 32 System parameters SNMP Parameters Screen
- Figure 5 - 33 System Parameters System Time Screen
- Figure 5 - 34 System Heartbeat Time Screen
- Figure 5 - 35 System Parameters System Reset Screen
- Figure 5 - 36 System Parameters Upgrade Screen
- Figure 5 - 37 Upgrade Dialog Box (Sheet 1 of 2)
- 5.6 COMMAND LINE INTERFACE (CLI)
- 5.7 REPEATER OPERATING PROCEDURES
- 5.8 CONTROLS, INDICATORS, and CONNECTORS
- 5.8.1 Signal Processing Unit (SPU) Controls and Indicators
- 5.8.2 High Power Amplifier (HPA) Controls and Indicators
- 5.8.3 Power Distribution Unit (PDU) Front Panel Controls
- 5.8.4 VSAT Receiver Rear Panel Connectors
- 5.8.5 Up-Converter Rear Panel Connectors
- 5.8.6 Modulator Rear Panel Connectors
- 5.8.7 Main Controller Rear Panel Connectors
Turn-Up an
d
Testing 3EM21522AAAA
DTR-0200-SA-SIRIUS Issue 1, March 2008
4-2
4.3
REPEATER PROVISIONING
Provisioning is the process of checking, changing, and/or installing parameter values
to allow the repeater to operate from its assigned location. Normally, no parameter
changes will be required except after replacement of the SPU.
1
Turn on repeater power
2
Connect computer to repeater controller Ethernet port
3
Access repeater GUI
4
Set repeater to Standby mode
5
Provision Repeater (check, change, install parameters as indicated by GUI
screen readings and consistent with local network engineering require-
ments)
6
Return repeater to Broadcast mode
7
Connect repeater to NMC.
4.4
FIELD TESTS
The purpose of the field test is to verify that the repeater meets specifications after
on-site repair. The field test will be performed with the Ku-Band Receive Chain of the
specific site.
A field test report form is provided to record the operating conditions and critical per-
formance parameters of the repeater after repair. This report should be kept on file
and referred to whenever the repeater is retested (after maintenance
, etc.).
4.4.1
Test Set-Up
1
Remove power from repeater by opening repeater main power circuit
breaker on the PDU (see Figure 4 - 1).
Figure 4 - 1 PDU Circuit Breaker Panel