User's Manual Part 1

Table Of Contents
3EM21522AAAA Turn-Up an
d
Testing
Issue 1, March 2008 DTR-0200-SA-SIRIUS
4-1
4 TURN-UP AND TESTING
4.1
GENERAL
This section describes the procedures required to turn-up and test the DTR-0200-SA-
SIRIUS repeater (ALU Part Number 3EM04000AA) after replacement of the Signal
Processor Unit (SPU), software upgrading, and/or other maintenance. These proce-
dures consist of repeater provisioning and field testing.
These procedures require GUI software screen access. For screen access pro-
cedures, refer to the Operations section of this manual.
4.2
TEST EQUIPMENT REQUIRED
Refer to Table 4-1 for required test equipment. Become familiar with the operation of
any test equipment before using it. Operating instructions for test equipment are not
inc
luded in this manual except for precautionary notes or special instrument settings
required for performance of a test procedure. When further information regarding test
equipment is required, refer to the equipment manufacturer’s instructional data.
Table 4-1 Test Equipment Required
Type
Power Meter
Power Meter Test Sensor
PC/Laptop