User's Manual Part 1

Table Of Contents
Insta
ll
ation 3EM21522AAAA
DTR-0200-SA-SIRIUS Issue 1, March 2008
3-2
3.2.4
Physical Safety
1.
The repeater will be secured to the building/pad before operation.
2.
Installation crew members must wear hard hats during installation.
3.
A minimum of two technicians is required for any lifting and/or position-
ing of the repeater cabinet.
3.3
INSTALLATION OVERVIEW
Site configuration, antenna configurations and locations, electrical service location,
phone line service location, and SIRIUS Repeater location, will all be in accordance
with Alcatel-Lucent provided construction/installation drawings that have been
approved for building permits and zoning and have been A&E stamped.
3.4
SITE POWER
Figure 3 - 1 depicts the recommended site ac power wiring:
Figure 3 - 1 AC Wiring (Sheet 1 of 2)
Notes:
1. Refer to Sheet 2 for ac power wiring schematic.
2. Conduit or BX cable will be routed to a single gang junction box installed on the
repeater pedestal or in close proximity to the repeater enclosure.
3. 4-conductor #8 power cable will be installed between the junction box and the
repeater power terminal block. Refer to Sheet 2, note 3.
DTR-1076
03/16/08