Assembly Manual for Poly carbonate Greenhouses 4 x 6 Greenhouse Table of Contents Introduction «+ «c+ sre r veer recsraasreernesrsasnseasns 1 General Adv Ice «cr ver rermneeinerianneeriieseans 1 About This Manual « cc sever retina transcontinental 2 Maintenance + ++ +c crs sets sets 3 Parts List rcs conferrer sneer cesneennsenrsonsonnsonssons 4 Assembling of per-fabricated Base «cov eri seen 5 Two foundation options with per-fabricated Base 6 Step 1: Assembling Of Do Or + +r cer vverrennransnensnans 7 Step
01 INTRODUCTION CONGRATULATIONS Congratulations on purchasing a Greenhouse. Please read the assembly manual and familiarize yourself with the parts and steps before assembling your Greenhouse. NOTICE It will take at least two adults about three hours to assemble the greenhouse. Do not assemble the greenhouse if tired or under the influence of alcohol, drugs or medication. Follow the manual step by step. Keep this manual for future reference. IMPORTANT The Greenhouse contains parts with sharp edges.
02 BASE As per your choice, you may receive a greenhouse with or without a per-fabricated base kit. Either way, this greenhouse must be secured to a firm base. The Base must be level and square. Before assembling the greenhouse, you must prepare a proper foundation. Two foundation options are provided in this manual. The concrete foundation option is recommended for a stronger installation. SITE SELECTION The greenhouse should be placed in an area that receives direct sunlight and gets shielded from wind.
03 SEALING Sealing the greenhouse by applying glue or tapes between the bicarbonate sheets and aluminum profiles will keep insects out and provide better stability against wind. Sealant and glue gun are not included. PARTS Identify all parts using the parts list on next page and labels on the parts. Layout each part needed for a step before working on that step. MAINTENANCE Inspect the greenhouse periodically. When the greenhouse needs cleaning, use a gentle detergent.
PARTS LIST Part No. Part Qty. Part No. Part Qty. Part No. Part Seo PaL (owes |g P4R NW 2 = 10L L Part No. Part Qty. PS iol P10 Part No. Part Qty. Part No. Part séL Ng 2 B Part No. Part Qty.
Assembling of Pr-fabricated Base Part No. Qty. Take the fully assembled base to the chosen site and secure the base to the ground. TIP: measure the length of the two diagonal of the base to make sure that the baseline square shape. Use a level to make sure the secured base is flat. se 3 and four F3 Bolts] to connect and 2. The head of F3 Bolt faces inside for easy assembly.
Two foundation options with per-fabricated Base Option 1 Corner Stakes mounted into the soil Easy and quick to install. Suitable to use in areas with less extreme weather Option 2 Corner Stakes mounted into concrete Best option if you want your greenhouse fully secured.
1. Assembling of Door Continued Insert P1 into the grooves of D1, D2, and D3. Direction: Right to Left. < Insert P1 into the grooves of D1, D3, and D3. Direction: Right to Left. < (5) Hi Notice: 1. D1 and D4 are not interchangeable. 2.
2. Assembling of Roof Vent Pa . Part No. Part Qty. ICC) AT ATA © ft Insert P2 into the grooves of D1, D3, and D3.
3. Assembling of Main Frame Continued Repeat six times. Notice 1. Do not tighten the nut. Only loosely screw it onto the thread. 2. Note that the orientation of the bolt and the nut cannot be changed. See the diagram below for better understanding.
13 3. Assembling of Main Frame Continued F4 16 Repeat two times Notice: 1. Nuts face inside. 2. Fasten these two nuts.
3. Assembling of Main Frame Continued OUTSIDE VIEW Notice: 1. Nuts face inside. 2. Fasten these two nuts.
3. Assembling of Main Frame Continued 10L 0 Pan @ ® Repeat four times @ (ror) Notice 1. Fasten the nuts each time after 7,10L, or 10R is connected to frames About step E, F, and G, only insert bolt F4 into the grooves. Do not screw the nut. @ 3. About step E, note that each 7 has two ® © grooves where F4 bolts will be inserted into. The groove facing either side wall of oD 6 the greenhouse is groove a, and the one facing either the door or the back wall is S groove b.
4. Assembling of Back wall Continued 0 Insert P3 into grooves of 7, 10R till P5 rests on 5. 7 till P3 rests on 5. 10L till P3 rests on 5. Repeat two times 0 Insert P5 into grooves of 10L, Insert P3 into grooves of 10R, Insert PAR into grooves of 7, 10L till P4R goes into the top groove of 12. Insert P6 into grooves of 10L, 10R till P6 goes into the top groove of 15. Insert P4L into grooves of 10R, 7 till P4L goes into the top groove of 12. Notice Have a person buttress the back wall.
4. Assembling of Back wall Continued Notice 1 1. About Step A or D, two Bolt F4 will be used. One comes from 7 and the other from 12. Both of these two bolts were inserted into respective grooves in previous steps. You do not need new bolts here, only the nuts. 2. Fasten the nuts. Notice 2 1. About Step B or C, three Bolt F4 will be used. One from 12, one comes from 10L/10R, and the rest from 15. All of these bolts were inserted into respective grooves in previous steps.
5. Assembling of Front wall Part No. Part Qty.
5. Assembling of Front wall Continued Notice 1. About Step B, only insert Bolt F4 into the groove. Do not screw the nut. 2. About Step C, one Bolt F4 will be used. It comes from 9 and was inserted into 9 in Step B. You do not need new bolts here, only the nuts. 3. Note the orientation of 13. 4, Notice that in step A and B, 9 has one of its end removed. The removed space is where 13 is rested.
5. Assembling of Front wall Continued Only insert the bolts. Do not screw the nuts. Repeat two times Insert P3 into grooves of 7 and 9 till P3 rests on 6. Repeat two times o Repeat two times Insert P4R into grooves of 7 and 9, till P4R goes into the top groove of 12. Insert P4L into grooves of 7 and 9, till PAL goes into the top groove of 12. Insert P7 into the top groove of 13. Have a person or a chair to buttress the front wall.
24 5. Assembling of Front wall Continued Attach B3 to 7 and 12 using per-inserted Bolts F4, Fasten the Nuts F4. Repeat two times. Attach B3to9 and 12 = using per-inserted RY Bolts F4. 2) Fasten the Nuts F4. & Repeat two times.
6. Assembling of Roof Frames Continued Only insert Only insert the bolts. the bolts. Do not screw Do not screw the nuts. the nuts. @) ( Repeat four times OUTSIDE VIEW sto VIEW Notice 1. About Step C, note that the profile view of 7|and 8 (the diagram on the right) shows the exact placement of 8. Note that the groove of 8 faces upward. 2. About Step C, the F4 Screw goes into the groove of 7 that faces either side wall of the greenhouse, groove a.
6. Assembling of Roof Frames Continued 16 ; F4a 7 /A Fasten 10 | the nut EER | 16 Notice: 1. Repeat Step A four times. 2. Notice that 16, like 7, has two grooves for bolts. The groove of 16 where the bolt of 8 goes into is the upper groove, groove a. 3. Note that Bolt and Nut set F4a in Step A-1 was one of the bolts per-inserted into the holes of 8 in previous steps. 7) ana lua Thy INSIDE VIEW 4. About Step A-1, It illustrates how to let the head of F4a go into 16’s groove a.
6. Assembling of Roof Frames Part No. Part Qty. 9 Continued 29 Note that 16 has two grooves, groove a on the upper side, and groove b on the lower side.
30 6. Assembling of Roof Frames Continued Notice 1. Note that the numbers of F4 bolts inserted into grooves of 16 in Step A and Step B are different. 2. Only insert the bolt. Do not screw the nut.
7. Securing of Frames Continued LY Slide 17 into 16. The per-inserted bolt F4 on 17 goes into the upper groove of each 16. Repeat two times, till the four Bolt F4 on both ends of 17 go into the four upper grooves of 16. Fasten the Nuts. BG) Notice About Step B, note that three Bolt F4 will be used. F4a and F4b were inserted into the lower groove(groove previous step. F4c was the one connecting 13 and 9 together in previous step. After all three F4 are attached to B4, fasten their nuts.
Part No, Part Quy. 2 @ s Roof Vent OUTSIDE VIEW [3 gelid “| 7. Securing of Frames Continued Notice 1. Four Bolt F4 will be used in step A. They are inserted into the lower groove of 16 in this very step. 2. Note how B5 and the bolts are connected. 3. Fasten the nuts 4. Repeat four times. 8 is rendered invisible in this diagram for better visibility..
34 7. Securing of Frames Continued Notice 1. Four Bolt F4 will be used in step B. They are inserted into the lower groove of 16 in this very step. 2. Note how B6 and the bolts are connected. 3. Fasten the nuts 4. Repeat two times. 17 is rendered invisible in this diagram for better visibility.. Inside View Notice 1. In step C and D, each step utilizes 4 Bolt F4. F4a and F4b were inserted into the upper groove of 16 in previous steps. F4c and Fad were inserted into the groove of 10L or 10R.
7. Securing of Frames Continued E-2 Notice Step E-1 Slide 18 into the position shown in E-1. The head of Bolt F6 should go into the groove of 18. Fasten the Nuts of both Fé. Step E-2 Slide the door into the position shown in E-2. The casters on the back of the door should rest on the bulging part of 18. Outside View Front Notice About Step F, slide the roof vent into the left track of 17, till the roof vent reaches 16 on the back wall.
37 8. Assembling of Middle Frame Continued Slide 19 to the position shown on previous page. The head of the Bolt F4 on 8 and 4 should go into the groove of 19. Before the head of the Bolt F4 on 4 goes into the groove of 19, Insert a Bolt F4 into the groove of 19 from the lower end. Fasten the Bolt F4 on 8 and 4 with nuts. Now there should be a Bolt F4 free to move inside the groove of 19. Slide 20 to the position shown on previous page. The head of the Bolt F4 on 8 and 17 should go into the groove of 19.
9. Assembling of Roof Vent Holder Continued Screw on the nut of Bolt F4 but do not fasten it. Screw on the nuts of Bolt F4 but do not fasten them. Note that at this step, the orientation of B7 does not matter. Place the newly assembled 12 next to the roof vent. Note that the three pointers of B7 must face toward the ridge. Locate two previously inserted F4 Bolts, one in the groove of 20 and the other in the upper groove of 16.
9. Assembling of Roof Vent Holder Continued (Roof Vent af Note that B's position decides the opening height of the roof vent. Fasten the nuts on B7 when you are satisfied with the opening. Inside View JI Inside View \ or Sra (6/10 41 Step D-1 and D-2 This step utilizes two previously inserted F4 Bolts, one in the groove of 9 (or 10L/10R for the blackball, the other in the groove of 7. Slide these two bolts to the position shown on the diagrams above and place 23 under the bolts. Fasten the nuts.
10. Assembling of Side Braces Continued 43 Step E-1 and E-2 This step utilizes two previously inserted F4 Bolts, one in the groove of 19 the other in the groove of 7. Slide these two bolts to the position shown on the diagrams on previous page and place 22 under the bolts. Fasten the nuts. Step E-3 and E-4 This step utilizes one previously inserted F4 Bolt found in the groove of 7. You also need another bolt, the one that connects 4 and 19. Unfasten its nut and place 22 under the bolt.
47 12. Assembling of Gutters and Caps Continued /\ Slide 25 into the groove Step BIDE are about adding plastic caps. Cap used in Step B is S6R. Cap used in Step C is S6L. Cap used in Step D is S8. Cap used in Step E is S7. Apply a small amount of silicone to secure these caps.
a9 Securing the greenhouse to the prefabricated Base Continued pron, oe ATTN aoa anent .. ATT ATT po Pe Pra Get inside the greenhouse and locate all the F4 Bolts on 4, 5, and 6. Unscrew the nuts. Attach B2 to the bolt, fasten the nut to secure the greenhouse to the base. There are 14 F4 Bolts.