Installation Guide
Faucet Installation
2
Installation Guide
1
2
3
4
5
6
7
8
9
10
11
12
13
IPS
SWEAT
OR
1. Before soldering, remove ceramic cartridge & pressure
balanced valve (1, 2, 3, 4, 5, 6). Then remove integral (7, 8, 9,
10, 11, 12, 13) from shower body.
2. After cool down from soldering, replace the integral (7, 8, 9, 10,
11, 12, 13) in reverse order back to shower body. Use a at
head screwdriver to turn the studs (9) to the “Close” position.
DO NOT install pressure balanced valve and ceramic cartridge.
Turn on water supply. Check connection for leak. Turn studs
(9) slowly to “Semi On” position and ush the system with both
hot and cold water for 1 minute. Turn off water supply and turn
studs (9) to “Full Open” position.
3. Replace pressure balanced valve and ceramic cartridge in
reverse order back to shower body. Make sure silicone seals
(A) are in the correct position. Installation without silicone seals
may cause leakage.
4. When connecting with a C x M Adapter, or a C x F Adapter,
wrap the threads with an adequate amount of Teon thread
tape. (20 wraps is recommended.)
Note: Connecting without Thread Tape may cause leakage.
5. Before reinstalling the ceramic cartridge make sure the
temperature ring (E) is set at the preset factory temperature
position. Soldering without removing the ceramic cartridge,
pressure balanced valve, and integral stop will void the factory
warranty.
C x M Adapter
(for IPS)
C x F Adapter
(for Sweat)
Ceramic Cartridge
5 A
Silicone Seal
Factory Temperature
Preset Position
E