Installation Guide

3
Installation Guide
G
G. Ensure that the o-ring is properly secured in
the tee tting before attaching.
Tighten the tee tting on to faucet shank.
Secure all ttings with a 1/4 turn of a
wrench.
Faucet Installation Continued
o-ring
tee tting
H. Attach the hot and cold supply lines to the
Tee tting at the faucet base.
Attach the opposite end of each hose to
the corresponding valve body ttings by
tightening the 3/8" compression ttings onto
the lines. Secure all ttings with a 1/4 turn of
a wrench.
H
I
I. Secure water line connections to each
corresponding faucet handle shank base.
Secure all ttings with a 1/4 turn of a wrench.
1
2