Installation manual

Page 4
The Project Information Prole
Before beginning any lift project, the sales person/project manager or someone qualied from your team
will need to complete a Project Information Prole. This sheet contains important information regarding
the customer’s occupied ofce.
Items that the Project Information Prole
addresses include:
The 5 major parts of a lift project
Í Suboor and rip-up
Í Type of furniture
Í Filing cabinets/storage
Í Wiring/power cabling
Í Phones and equipment
It is very important that this information is as
accurate as possible. It is encouraged that
someone who understands the lift process and
has been on lift projects be involved with lling
out the sheet for the success of the project.
A copy of this form is provided in Support
Materials section of this manual.
Bad information could lead to the following:
Í Not knowing the correct furniture:
This could lead to lower yardages, damaging furniture or even worse not being able to lift
furniture the 1
st
couple of nights until you get the correct tools.
Í Rip Up/Suboor
This is always a big one. Running into a bad rip-up could mean the different between 250
yards a night or 100 yards a night. Now you are affecting the bottom line. $$$$$$. If your
suboor is in bad shape this again this slows down the installation crew.
Í Keep in mind that all being done in and around furniture & equipment and conventional
oor prep and rip-up does not always apply to a lift project.
Project Information Profile