Installation manual

Page 18
Plan Your Layout
A very important part of the process involves the layout. By doing a preliminary layout, you can plan the
progress of your job nightly. Taking the time to do a preliminary layout will also let you take advantage of
combining tough areas with easy ones, helping you set the pace and production of the lift project.
If the project is mainly a large open area, plan your layout with your control lines as close to the center of
the room as possible. Breaking the room into four sections would be recommended.
If the job has an inner core, such as an elevator lobby, that must be wrapped completely around. Place
your control lines near the core.
Go through the furniture in complete clusters of workstations. Do not stop halfway through a workstation
as it could create one of the following problems.
The person in the unnished workstation will have to pack and unpack twice.
You will have to move the furniture twice inside the workstation.
You will have to lift the furniture twice which increases the possibility of damage of problems.