Installation manual
Page 17
Pre-Installation Walk-thru
When planning your layout try to keep the following things in mind and look for problem areas that need
to be addressed with the customer.
Í Plan areas to go through in complete sets of furniture workstations
Í Are there a lot of ling cabinets and are they gang bolted.
■ If they are gang bolted now they are full and can be nearly impossible to move or perform a
lift on.
Í Are there areas that will need extra time for the customer to get ready?
■ Avalanche areas (stacks of lose paper and books piled on furniture that will be moved and
could potentially end up on the oor)
Í Bookshelves
■ Poor quality bookshelves can fall apart or when moved need to be down loaded or emptied.
■ Some companies have gang bolted bookshelves that will require more advance time to deal
with.
Í Libraries
■ Most library shelves do not like to be lifted or moved they tend to be very top heavy
■ There is special equipment available for moving and/or lifting library shelving.
Í Utility shelves
■ These are the metal shelves that have shelves that are held in place by gravity hooks - these
must be down loaded.
Í Copiers
■ Small copier are usually not too bad unless they have a sorter attached then they can be
tricky as you have to be careful not to dislodge or misalign it when moving it around.
■ Large and expensive copies need to be moved by qualied personal as if you move it and
something goes wrong it could void the manufactures warranty. Most companies have
service contracts on this type of equipment.