Installation Instructions

6' High EcoStone Panel
4' High EcoStone Panel
- For a 4' installation, 
the bottom of the post 
should be cut leaving, 
a 69"-74" post  
(50" above ground 
and 24" below 
ground) 
- Cut the bottom of the 
post. NEVER cut the 
top of the post
- For a 6' installation, use our  
102" posts which is designed to 
be 28"-to-30" in the ground and 
72"-74" above ground. 
- Cut the bottom of the post. 
NEVER cut the top of the post
Post Centers
71.50"
102"
74"
10"-12" 
Hole Diameter
28"
70.25"
Stiffener Length
1.5" x 1.5" Gauge Galvanized Steel Stiffener
ASTM A513
5










