Installation manual
Simrad SP90
60
851-164510 / Rev.E
7 CABLE LAYOUT
7.1 Introduction
This chapter describes the installation requirements for SP90
system cables. These instructions must be used together with the
applicable cable plan.
Note: All electronic installations and corresponding wiring must be in
accordance with the vessel’s national registry and
corresponding maritime authority and /or classification society.
If no such guide-lines exist, Simrad AS recommends that Det
Norske Veritas (DNV) Report No. 80-P008 «Guidelines for
Installation and Proposal for Test of Equipment» be used as a
guide.
Topics
→ System cabling, page 61
→ Cable plan, page 62
→ Cable specifications, page 64
→ Wheelhouse cabling, page 67
→ Sonar room cabling, page 75
Related topics
→ General cable requirements, page 84
→ Peripheral equipment, page 87