This chapter describes the installation requirements for SP90
system cables. These instructions must be used together with the
applicable cable plan.
Note: All electronic installations and corresponding wiring must be in
accordance with the vessel’s national registry and
corresponding maritime authority and /or classification society.
If no such guide-lines exist, Simrad AS recommends that Det
Norske Veritas (DNV) Report No. 80-P008 «Guidelines for
Installation and Proposal for Test of Equipment» be used as a
guide.
Topics
System cabling, page 61
Cable plan, page 62
Cable specifications, page 64
Wheelhouse cabling, page 67
Sonar room cabling, page 75
Related topics
General cable requirements, page 84
Peripheral equipment, page 87