Installation manual
Introduction
1
851-164510 / Rev.E
1INTRODUCTION
1.1 The purpose of this manual
The purpose of this manual is to provide the information and
basic drawings required for installation of the Simrad SP90
sonar system. These instructions must be followed carefully to
ensure optimal sonar performance. As a guide, installation
procedures are presented in the order they are to be performed.
Successful completion of each procedure is to be confirmed by
checking off the corresponding box. After installation, this
document should be stored on board the vessel for later
reference when updating or servicing the equipment.
Note: The installer is responsible for the equipment during the
installation. The guarantee is only valid when the installation is
made in accordance with this manual.
Installation procedures
Installation procedures for the standard Simrad SP90 sonar
system can be grouped under the following main categories:
→ Installation planning, page 24
→ Installation trunk, page 31
→ Hull Unit, page 38
→ Transceiver Unit, page 46
→ Wheelhouse Units, page 51
→ Cabling, page 60
→ Peripheral equipment, page 87
→ Start-up procedures, page 99
→ Testing the peripheral equipment, page 136
→ Final tests and measurements, page 150