Installation manual

Start-up procedures
99
851-164510 / Rev.E
9 START-UP PROCEDURES
9.1 Introduction
The procedures in this chapter shall be carried out once all the
hardware units have been installed, and the cabling is finished.
When you perform the procedures, make sure that you only
perform those tasks described, and in the given order. Also,
check off every item in the procedure as you carry on.
Procedures
Checklist before start-up commences, page 100
Staring the stand-by power supply, page 101
Staring up the Hull Unit, page 103
Starting the wheelhouse units, page 109
Checking the Operator Panel, page 111
Checking the hoisting and lowering system, page 117
Starting up the Transceiver Unit, page 123
Self-noise test, page 125
System startup, page 126.
Alignment of the sonar picture, page 130
Alignment of the stabilization offset, page 132
Defining own ship parameters, page 134