Installation manual

Cable layout and connections
67
851-164574 / C
2 Terminate the cable shielding.
Cable shielding is shown in figure 23.
Cable
main
screen
(CD3117)
Figure 23 Termination of
cable shielding
3 Terminate the seven cable pairs onto terminal block E201 in
the Transceiver Unit.
- For the insulation of the shielding of each of the cable
pairs, use part of the supplied cable sleeve.
Refer to the cable connection drawing on page 180 for
termination details for E201.
4 Run the cable from the Transceiver Unit to the Motor
Control Unit mounted on the gantry.
5 Use the cable gland on the right-hand side in t he Motor
Control Unit, and terminate the cable shielding in the cable
gland.
The cable shielding is described in figure 23 on page 67.
The interior of the Motor Control Unit is s hown in figure
24.
6 Create a small cable slack inside the Motor Control Unit as
indicated in the figure.
7 Make the E301 connections in the Motor Control Unit
according to the cable connection drawing.
- Note that the shielding of each cable pair shall not be
connected in the Motor Control Unit.
Refer to the cable connection drawing on page 180.