Installation manual
Cable layout and connections
53
851--164300 / C
7 CABLE LAYOUT
7.1 Introduction
This chapter describes the installation requirements for SH80
system wiring. These instructions must be used together with the
applicable cable plan.
Note All electronic installations and corresponding wiring must be in
accordance with the vessel’s national registry and corresponding
maritime authority and /or classification society.
If no such guide-lines exist, Simrad AS recommends that Det
Norske Veritas (DNV) Report No. 80-P008 «Guidelines for
Installation and Proposal for Test of Equipment» be used as a
guide.
The following information is provided:
→ System cabling, page 54.
→ Cable plan, page 55.
→ Cable specifications, page 56.
→ Wheelhouse cabling, page 58.
→ Sonar room cabling, page 64.
More information concerning cabling i s found in these chapters:
→ General cable requirements, page 70.
→ Peripheral equipment, page 73.